Laserfiche WebLink
tif REQUEST FOR ACTION <br /> River <br /> To ITEM NUMBER <br /> Planning Commission 4.4 <br /> AGENDA SECTION MEETING DATE PREPARED BY <br /> Planning November 9, 2012 Jeremy Barnhart,Planning Manager <br /> ITEM DESCRIPTION REVIEWED By <br /> Request by Cornerstone Auto Resource for Preliminary and Jeremy Barnhart, Planning Manager <br /> Final Plat Approval for plat of Jabez,Public Hearing- Case No. REVIEWED BY <br /> P 12-04 <br /> ACTION REQUESTED <br /> Staff recommends approval of the Preliminary and Final Plat as illustrated on drawings date stamped <br /> September 24, 2012,with the following conditions: <br /> 1. Additional right-of-way of about 16.22 feet shall be provided along 171"avenue as shown on <br /> the drawing. <br /> 2. The plat shall provide access control along Highway 10 frontage prohibiting access. <br /> 3. The development shall meet all applicable fire codes. The Fire Chief shall verify the location <br /> of all fire hydrants, and may require additional hydrants necessary to preserve the health and <br /> safety of the residents. <br /> 4. A surface water management fee for lot 1 shall be paid at the time the Final Plat is released <br /> for recording(currently$1,214 per acre or$21,524.22 total). Surface water management fee <br /> for outlots A and B shall be paid at the time those lots are released for recording at the rate <br /> established at that time. <br /> 5. A Park dedication fee shall be paid for 8.05 acres at the time the Final Plat is released for <br /> recording(currently 7,444 per acre,or$59,924.20 total). Park dedication for outlots A and B <br /> shall be paid at the time those lots are released for recording at the rate established at the <br /> time. <br /> 6. All required subdivision/park information shall be provided in an electronic format(.dwg <br /> file) as required by the City Ordinance and Land Use Application prior to recording of the <br /> plat. <br /> 7. This approval of the Preliminary Plat shall expire after 1 year,unless the property owner or <br /> owner's agent has recorded the Final Plat or received an extension. <br /> The Park Commission, at their meeting on October 10,2012,in regards to the Park Dedication <br /> recommendation,recommends the applicant pay park dedication on the full 17.73 acres being platted as a <br /> buildable lot. This increases the park dedication to$131,982.12. <br />