Laserfiche WebLink
l REQUEST FOR ACTION <br />R.ie <br />TO ITEM NUMBER <br />Ma or and Ci Council 8.1 <br />AGENDA SECTION MEETING DATE PREPARED BY <br />General Business March 19, 2012 Rich Czech, Elk River Ice Arena <br /> Mana er <br />ITEM DESCRIPTION REVIEWED By <br />Value Engineering Study for The Barn and Olympic Ice Arenas Michael Hecker, Park and Recreation <br /> Director <br /> REVIEWED BY <br /> Cal Portner, Ci Administrator <br />ACTION REQUESTED <br />Authorization to move forward with a value engineering study of the Barn's roof, structure, and HVAC <br />systems as well as the inspection of the Olympic precast panels and roof for the Olympic looker rooms. <br />BACKGROUND/DISCUSSION <br />The Barn, the original ice arena constructed in 1971, has had ongoing roof issues for several years. Staff <br />and contractors have provided numerous fines with little success to correct leaks. Further, the ice-making <br />plants for the Barn and the Olympic utilize HCFCs - 22 refrigerant which are being phased out of <br />production. By the year 2020, production of HCFCs refrigerant will be discontinued. Please see the <br />attached phase-out schedule by the United States Environmental Protection Agency. <br />With the age of the Barn and major renovations that are likely to be faced in the next few years, the <br />question is whether the city would be better served to demolish the barn and reconstruct a new building <br />rather than continue with the increasingly expensive repairs. <br />Replacement for the Barn is included in the 2012-2016 CIP. <br />When the City Council met in a joint meeting with the Elk River School Board in October 2011, the <br />Board indicated they were not interested in sharing the costs of a replacement arena. Likewise, the Elk <br />River Youth Hockey Association has not yet committed to sharing costs of a replacement facility. <br />At the January Arena Commission meeting, the Commission directed staff to pursue quotes for value <br />engineering studies for the Barn's roof, structure, and HVAC system for the purpose of determining the <br />true condition of the Barn and its ancillary equipment to estimate the costs of the required repairs and <br />estimate the remaining lifespan of the building. The Commission also discussed and identified a need to <br />complete locker room improvements in the Olympic arena. <br />At a special Arena Commission meeting held Tuesday Apri113, 2012, the Commission reviewed <br />proposals for the work and voted to recommend to the Council four companies to complete the work. <br />Attached for your review are the proposals from the four companies. <br />~ M E R E~ ® Y <br />N:\Public Bodies\City Counci]\Counal RCA\Agenda Packet\03-19-2012\Action Requested for Bam's studys.docx ~~ <br />