Laserfiche WebLink
If these proposals are approved, the inspections should be able to be completed by the next Arena <br />Commission meeting in April and the Commission should have enough information to decide how to <br />proceed. <br />FINANCIAL IMPACT <br />The total cost for all studies is $7,680. Recommendation for the funding is from the Government <br />Building Fund. <br />ATTACHMENTS <br />^ Proposal from Lindeau Companies for the assessment of the Barn's structure. <br />^ Proposal from Skyline Building Envelope Consultants for the study of the Barn's roof. <br />^ Proposal from Skyline Building Envelope Consultants for the study for the Olympic precast <br />walls and the roof for the Olympic locker rooms. <br />^ Proposal from Stevens Engineering for the study of the refrigeration systems. <br />^ Proposal from Hallberg Engineering for the study of the HVAC systems. <br />^ Information from the United States Environmental Protection Agency. <br />Action Motion by Second by Vote <br />Follow Up <br />N:\Public Bodies\Ciry Council\Council RCA\Agenda Packet\03-19-2012\Action Requested for Bam s studys.docx <br />