My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 03-19-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
03-19-2012
>
8.1. SR 03-19-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2012 10:56:30 AM
Creation date
3/16/2012 10:54:29 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/19/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If these proposals are approved, the inspections should be able to be completed by the next Arena <br />Commission meeting in April and the Commission should have enough information to decide how to <br />proceed. <br />FINANCIAL IMPACT <br />The total cost for all studies is $7,680. Recommendation for the funding is from the Government <br />Building Fund. <br />ATTACHMENTS <br />^ Proposal from Lindeau Companies for the assessment of the Barn's structure. <br />^ Proposal from Skyline Building Envelope Consultants for the study of the Barn's roof. <br />^ Proposal from Skyline Building Envelope Consultants for the study for the Olympic precast <br />walls and the roof for the Olympic locker rooms. <br />^ Proposal from Stevens Engineering for the study of the refrigeration systems. <br />^ Proposal from Hallberg Engineering for the study of the HVAC systems. <br />^ Information from the United States Environmental Protection Agency. <br />Action Motion by Second by Vote <br />Follow Up <br />N:\Public Bodies\Ciry Council\Council RCA\Agenda Packet\03-19-2012\Action Requested for Bam s studys.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.