Laserfiche WebLink
cti~n e ~ u~s~~ <br />The City Council is asked to accept the bid from Knife River Corporation for bituminous improvements <br />to Line Avenue and authorize proceeding with construction as described i.n the agreement between the <br />City of Elk River and Sherburne County related to this improvement. <br />ackr®unl iscussi®n <br />The City of Ells River, in cooperation with Sherburne County Public ~Iorks, has solicited bids for the <br />reclamation and bituminous paving of Line Avenue from 183rd Circle to Twin Lakes Road. Sherburne <br />County opened bids on March 9, 2010. There were a total of six bids submitted. A tabulation of the bids <br />is attached. Bids for the Elk River portion of the overall contract are as follows: <br />Contractor <br />Knife River Corporation <br />Central Specialties, Inc <br />Hardrives Inc, <br />Rum River Contracting <br />ASTECH Corporation <br />Base Bid <br />~3,G50,924,G9 <br />~3,940,G59,12 <br />~3,971,5SO.GS <br />~3,995,8G9,04 <br />X4,423,045.25 <br />Schedule S ~ City of EIk River <br />$12G,G94.72 <br />$155,020.00 <br />$145,554,1 S <br />~14o,4G9.25 <br />$1G5,771.00 <br />The low base bid was submitted by Knife River Corporation, the Ells River portion of this bid is <br />$12G,G94.72 for the proposed improvements to Line Avenue, <br />,~ ®s~ rover~~n~s <br />The worl~ in bid schedule S includes reclaiming the existing bituminous surface to a depth of six inches, <br />grading, removing excess bituminous millings, placement of two inches of bituminous base, and <br />placement of two inches of bituminous wearing course, The reclaiming process would be similar to the <br />work that was done in the King, Lowell, Morton, and Norfolk areas in 2009 and the Highway 10 parking <br />lot in 2008. <br />C.~Dacumcnts and Settings~jnuller~Lacal 5ettings~'1"emporary Internet ~'iles~0~,K3~~Line Avernie Action Rec~uested,doc <br />