Laserfiche WebLink
urnNn ~ <br />. ~,~, ve ants <br />In additian to the bituminous improvements, the work in bid schedule $ includes enlarging the curb radius <br />of the northwest cornea of the intersection of Line Avenue with Twin Lakes Road from 34 feet to 50 feet. <br />The existing radius allows for same but not all vehicles to male this turn without either hacl~ing over the <br />curb ox swinging wide and into the oncoming lane of traffic. with the proposed 50 foot radius, buses, <br />shaight single unit Mucks, and smaller semi Mucks ~wB50} would be able to negotiate the turn onto Line <br />Avenue without hacking over the curb. If larger semi trucks ~wBGS} attempt making the turn yin the new <br />conf~guxation, they would still tracl~ over the curb. Based on observations of traffic and tracl~ing aver the <br />curb that has occurred, increasing the radius to 50 feet will support the majority of haffic needs at the <br />intersection. The cost of the curb improvements included in the bid is $G,5$9.G0 <br />®nsruc~~®n ®~rrnar®n <br />Befoxe canshuction may begin, a schedule of worl~ will be submitted by the conhactox. The contractor is <br />responsible for• maintaining access to properties throughout conshuction. Residents on Line Avenue <br />affected by construction will be notified prior to construction commencing. The contract requires 14 days <br />advance notice be posted before any street closure or detours ale in place. The schedule in the conhact <br />allows for the contactor to begin any time after July 7, 2010 and complete all worl~ by September 3, 2010. <br />The special provisions for the woxl~ on Line Avenue require the contractor to have the bituminous base in <br />place within 14 calendar days of beginning work on Line Avenue. <br />~nanc~a~_~rnpa~ct <br />The budgeted amount for this project is $135,000 from the Street Reset~re Fund. The street division will <br />provide bucking to haul away and stock pile excess millings. The stockpiled millings will be used as <br />aggregate by the sheet division for maintenance of other sheets through out the city. In addition to the <br />bituminous pavement work in this conhact, pavement marl~ings need to be replaced. This work will need <br />to be contracted for separately and will be combined with annual pavement marking woxk in the city <br />provided the schedules permit. <br />ttachen~s <br />® I~id tabulation <br />C~~~n Moron by Second by Vote <br />®l~~ <br />C,~Documents and Settin~s~jmiller~Lacal 5et~ngs~'~'emparaiy Ynternet Files~OLK3E~Line Avenue t~ction Requested.doc <br />