My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 06-26-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
06-26-1995
>
4.4. SR 06-26-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2008 3:53:38 PM
Creation date
10/27/2008 3:53:37 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/26/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 22, 1995 <br />File: 230-256-20 <br /> Council Members <br />1326 Energy Park Drive Clty Of Elk River <br />St. Paul, MN 55108 13065 Orono Parkway <br />612-644-4389 P.O. BOX 490 <br />1-800-888-2923 Elk River, MN 55330 <br />ITEM 4.4. <br />Fox: 612-644-9446 <br />RE: WASTEWATER TREATMENT PLANT BUILDING REPAINTING <br />Dear Council Members: <br />We have investigated the paint system proposed by Rainbow, Inc., the low bidder of the <br />above referenced project. The Tri-Sheen products the Contractor proposed with their <br />June 14th resubmittal, have similar ingredients as the Thoro products we specified. Both <br />products have similar characteristics and the same waterprooFmg capability. With <br />Tri-Sheen products, staining can be omitted. <br />avR ENGwEERING In discussion with the wastewater treatment plant superintendent, Mr. Darrell Mack, we <br />ENVIRONMENTAL feel that the Contractor's proposed paint system is acceptable. Although, the Contractor <br />MuNloPm made a legitimate mistake in their original bid, their resubmittal of $20,350 is still <br />PLANNING substantially lower than the second low bid, which was $27,231 without staining, and <br />LID WASTE $31,764 with staining. In comparison with the Contractor's original bid price, the <br />RuauRAl resubmittal is only $740 higher than the original bid price of $19,610 with staining. <br />SURVEYING <br />TRAEHC Instead of re-advertising the project, we recommend the City award the project to <br />TRANSPORTATIO" Rainbow, Inc., followed by issuance of a change order to accept the Contractor's <br />recommended paint system. Thank you very much for your attenfion to this matter. If you <br />ELECrRICAI/MECHANICAI have an uestions, lease feel free to call me at 644-4389. <br />ENGINEERING. Y 4 P <br />HVAC <br />POWER DISTRIBUTION S1nCCrely, <br />SCADA <br />svsrEMCONTRO~s MSA, CONSULTING ENGINEERS <br />.~ <br />c~ <br />B>ll Chang, P.E. <br />BC:pd <br />ce: Mr. Pat Klaers, Administrator, City of Elk River <br />oFElces IN: Mr. Darrell Mack, WWTP Superintendent, City of Elk River <br />MINNEAPOLIS <br />~RIORLAKE 256-2228.jun <br />BT. PAUL <br />WASECA <br />
The URL can be used to link to this page
Your browser does not support the video tag.