My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 06-26-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
06-26-1995
>
4.4. SR 06-26-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2008 3:53:38 PM
Creation date
10/27/2008 3:53:37 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/26/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
luw~st~+ <br /> June 15, 1995 <br /> File: 230.256-20 <br />OL77NC 6NGINB~P~ <br />Ms. Alice Hainecke <br />1326 Energy Pork Drire Administrative Assistant <br />SI. Paul, MN 55108 City of Elk River <br />612-644.4389 13065 Orono Parkway <br />1-800.888-2923 P.O. Box 490 <br />Fax: 612.644-9446 Elk River, MN 55330 <br />RE: BID WITHDRAWAL, WWTP BUILDING REPAINTING <br />ELK RIVER, MINNESOTA <br />Dear Ms. Hainecke: <br />On June 2, 1995, I sent a letter to Mr. Pat Klaers recommending the City award the <br />referenced project to Rainbow, Inc. This recommendation has been included in the agenda <br />for the June 19th Council meeting. Rainbow, Inc., however, has advised us in a letter <br />dated June 14, 1995 (attached) that they have misinterpreted the bidding documents and <br />CIVILENGINEERING underestimated the project cost. Due to the significant cost difference from their original <br />ENNRONMENTAL bid price, Rainbow, Inc., requested to withdraw their original bid. In addition, the <br />MUNICIPAL Contractor resubmitted a bid based on a different paint system which, aS they suggested, <br />PIANNING could accomplish the same purpose aS the paint system we specified. The revised bid price <br />D WASTE of their paint system is $20, 350 (compared to their original bid prices of $12,210 without <br />UO1~` staining and $19,610 with staining). The paint system suggested by the Contractor needs <br />SURVEYING to be evaluated and discussed with Mr. Darrell Mack. The City could retain the <br />TRAFFIC <br />Contractor's hid bond and re-advertise the project, or accept the Contractor's suggested <br />TRANSPORTATION <br />paint system by way of a change order. <br />ELECTRICAUMECHANICAL <br />ENGRJEER~NG: Please bring this issue to the attention of Mr. HIaers. If you have any questions, please feel <br />Hvnc free to call me. <br />PowER olsTRisunoN <br />scnoA Sincerely, <br />SYSTEM CONTROLS <br />MSA, CONSULTING ENGINEERS <br />Bill Chang, P.~ <br />BCaw <br />Attachment <br />OFFICES IN: <br />MINNEAPOUB cc: Mr. Pat Klaers, Administrator, City of Ells Rive; <br />~ioe uKE Mr. Darrell Mack, W WTP Superintendent, City of Elk River <br />ST. PAUL <br />256-1506.jun <br />WASECA <br />
The URL can be used to link to this page
Your browser does not support the video tag.