My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 07-07-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
07-07-2008
>
5.3. SR 07-07-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2008 3:02:15 PM
Creation date
7/2/2008 4:09:33 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/7/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~~ <br />cty or <br />Elk .~.-~ <br />River <br />REQUEST FOR ACTION <br />To Item Number <br />Ci Council 5.3. <br />Agenda Section Meeting Date Prepared by <br />Administration ul 7, 2008 Ter Maurer, Public Works Director <br />Item Description Reviewed by <br />2008 Bituminous Overlay -Public Hearing/Assessment Tim Simon, Finance Director <br />Hearing Reviewed by <br />Action Requested <br />The City Council is asked to conduct a public hearing/assessment hearing for the 2008 <br />Bituminous Overlay Improvement. After the hearings are closed, the Council is requested to <br />consider adoption of three resolutions: The first, ordering the improvement; the second, <br />adopting the assessment roll; and the third, accepting the bid and authorizing execution of the <br />contract. <br />Background/Discussion <br />As directed by the City Council, bids were opened for the 2008 Bituminous Overlay on Thursday, <br />June 19, 2008. There were a total of six bids received. Following is a list of the bidders and their <br />total bids. The complete bid tabulation is attached. <br />Contractor Bid Amount <br />Rum River Contractin Com an $422,664.11 <br />Astech Co oration $457,551.30 <br />Northwest As halt, Inc. $476,300.51 <br />North Valle ,Inc. $478,797.40 <br />Knife River Cox oration $526,973.24 <br />Hardrives, Inc. $571,128.87 <br />The low bid received from Rum River Contracting also includes $34,751.00 for paving the lift <br />station gravel road at the River Park development. That work has been funded by the developers <br />of River Park. Subtracting that from the total low bid, the bid is approximately 25% under the <br />feasibility estimate. At the close of the public hearirxg/assessment hearing and passage of the <br />resolution adopting the assessment roll, we will be prepared to recommend award of the contract <br />to Rum River Contracting as the lowest responsible bidder. <br />At Monday evening's meeting, the public hearing/assessment hearing for the project is scheduled. <br />I will be prepared with a presentation that will discuss why the City does these types of projects, <br />show some photographs from the various areas proposed to be overlaid, and go through the <br />assessment analysis. Allowing a small percentage for contingency above the bid of Rum River <br />Contracting Company, since it is a per unit contract, I will be prepared to recommend that the <br />City Council reduce the assessment rate per unit from $1,963 to $1,500. <br />
The URL can be used to link to this page
Your browser does not support the video tag.