My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.6. SR 05-22-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
05-22-1995
>
6.6. SR 05-22-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2007 9:59:24 AM
Creation date
12/21/2007 9:59:24 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/22/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />~ May 19, 1995 <br />__......._....__..__......._.... File: 230-265-20 <br />~Pltil~ M;tiCItif;N;1~S <br />132b Energy Pork Drive Honorable Mayor and City Council <br />S!. Pouf, MN 55148 City of Elk River <br />6i 1.•644.4389 13065 Orono Parkway <br />i-800.888.2923 P.O. BOX 490 <br />Fox: 612.644-9446 Elk River, MN 55330 <br />ITEM 6.6. <br />RE: MAIN/EVANS DRAINAGE IMPROVEMENTS <br />Dear Council Members: <br />As directed, we have prepared plans and specifications for the Main/Evans drainage <br />improvement. At this point in time, we would request the City Council consider the <br />attached resolution authorizing the advertisement for bids. We would propose an early June <br />bid date. <br />CIYIt ENG(NEERiNG There are srili a number of outstanding issues we are working on which need to be resolved <br />ENVIRONMCNTAI prior to beginning construction, such as obtaining easements from four property owners, <br />MurRaPnL coordination with UPA for the crossing of their driveway, and approval of a MnDOT <br />~I`'""'"~ permit for work in their right-of-way. <br />tID WASTE <br />siRUCTURAi For your information, the following briefly describes the major construction components <br />SURvErtr~G of the project: <br />TRAFfK <br />TRANSPORTATION 1 The intersection of Main and Evans will be closed to traffic for a short period of <br /> lime while several high capacity catch basins are installed and a connection to the <br />FIECTRICAt/M[CHANICAI <br />ENc,NEER,NC: existing storm sewer is made. This connection to the existing storm sewer will <br />HvAC actually take storm water from the west in Large rainfall events. <br />POWER DISTRIBL`TION <br />sc~oA 2. The storm sewer along Main Street will be constructed in a 12-14 foot wide area of <br />srsTEMCONTROts the street immediately adjacent to the curb and gutter. Due to the location of other <br />utilities and cost of concrete curb and gutter and sidewalk, this is the best location. <br />During this construction, traffic in both directions will be maintained; however, the <br />area will be signed as a construction zone. <br />3. The storm sewer is proposed to follow the west and south property lines of <br />Dr. Johnson's and the west and south property lines of Earl Hohten's prior to <br />outletting into a newly constructed ditch. Since this does not follow the County <br />Ditch easement, new drainage and utility easements will need to be provided by the <br />oFFitES iN: affected property owners. We expect these free of charge since it is a.n <br />~NNEAPOLIS improvement to their property to eliminate the wider, more restrictive County Ditch <br />PRIOR LAKE easement. <br />51. PAUL <br />WASECA <br />~~ ° .d ~nr~,d .is asw z ~ s z ~~ sue.-~. ~ -~-.t~w <br />
The URL can be used to link to this page
Your browser does not support the video tag.