Laserfiche WebLink
�, <br />Elk s �- <br />River <br />Request for Action <br />To Item Number <br />Ma Tor and CinT Council 4.3 <br />Agenda Section Meeting Date Prepared by <br />Consent Agenda April 3, 2023 Matt Stevens, Wastewater Treatment FacilityT Chief <br />O eYator <br />Item Description Reviewed by <br />Bids: SanitaryT Se`ver Cure in Place Pipe Installation Brandon Wisner, En ineerin Pro�ect Mana er <br />Reviewed by <br />Cal Pormer, Ci T Administrator <br />Action Requested <br />Approve, byT motion, bid from Visu-Sewer, Inc. for Cure in Place Pipe (CIPP) installation in the School Vie`v <br />development in the amount of $44,454.50. <br />Background/Discussion <br />This neighborhood is slated foY a full reconstruct as part of the 2023 Street Improvement PYoject. <br />The cityr seweY system is original to the 1970 development This CIPP installation pYolongs the asset foY aYeas that <br />we didn't have CIPP lined in 2014. <br />Staff obtained two bids and recommends the low bid from Visu-Sewer, Inc. <br />Financial Impact <br />$44,454.50 from the WastewateY budget. <br />Mission/Policy/Goal <br />Responsible for everyT dollar — good ste�vards <br />Attachments <br />■ Visu-Sewer, Inc. proposal <br />■ HyTdro-Klean, LLC proposal <br />The Elk River Vision <br />A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional <br />se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. <br />row�REo ar <br />�I'1 ���� <br />Update�l• January 2023 <br />