My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5 ERMUSR 12-12-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
12-12-2021
>
5.5 ERMUSR 12-12-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 3:37:55 PM
Creation date
12/13/2021 3:37:55 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
44 - <br /> Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Chris Kerzman — Engineering Manager <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> December 14, 2021 5.5 <br /> SUBJECT: <br /> Field Services Facility Expansion Project Update <br /> ACTION REQUESTED: <br /> Approve Change Order#3 —Site Utilities Changes <br /> DISCUSSION: <br /> We were fortunate that the weather cooperated, allowing the curb and base course of asphalt <br /> through the middle of the site to be installed before freezing temperatures set in. The plumbing <br /> and electrical contractors have been working on below grade installations prior to the floor <br /> pour. The wood beams are scheduled for arrival during the week of December 13, and the <br /> roofing contractor has started to deliver material to the site. <br /> Work over the next month is anticipated to include below grade plumbing, concrete floor pour, <br /> as well as the installation of wood beams, roof decking, and roofing. Once the roofing is <br /> complete RJM Construction will be able to heat the building and continue with indoor <br /> contractors. <br /> Staff has been in discussion with RJM to evaluate site utilities and earthwork change order <br /> requests. RJM has agreed to cover the contractor costs for some out-of-scope earthwork <br /> caused by underground conditions with allowance and contingency funds. They have submitted <br /> the attached change order for the site utilities changes. These were changes required by <br /> Minnesota Department of Labor and Industry review, which rerouted the sanitary sewer <br /> connection and impacted storm sewer installation. <br /> FINANCIAL IMPACT: <br /> Change order#3 is an increase to the project of$57,195.62. This brings the guaranteed <br /> maximum price (GMP) to $12,205,650.74, which is ultimately an increase to the project of <br /> $24,724.74 compared to the original GMP after the deductive change order for the adjustments <br /> due to subcontractor default insurance. RJM has agreed to cover the increases related to buried <br /> debris and unsuitable soils out of contingency and allowance funds. <br /> ATTACHMENTS: <br /> • Change Order#3 —Site Utilities Changes <br /> Page 1 of 1 <br /> 136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.