My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5 ERMUSR 12-12-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
12-12-2021
>
5.5 ERMUSR 12-12-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 3:37:55 PM
Creation date
12/13/2021 3:37:55 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:BD8794FC-218D-464E-AC8C-1F827DBAB11F <br /> Document G701 n — 2017 <br /> Change Order <br /> PROJECT:(Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: <br /> Elk River Municipal Utilities Contract For:Construction Manager at Change Order Number:003 <br /> Field Services Facility Risk <br /> Project#108820 <br /> 1705 Main St. Date:April 13,2021 Date:December 7th,2021 <br /> Elk River,MN 55330 <br /> OWNER:(Name and address) ARCHITECT:(Name and address) CONTRACTOR:(Name and address) <br /> Elk River Municipal Utilities Kodet Architectural Group Ltd RJM Construction <br /> 13069 Orono Parkway 15 Groveland Terrace 830 Boone Avenue North <br /> Elk River,MN 55330 Minneapolis,MN 55403 Golden Valley,MN 55427 <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits.Also include agreed upon adjustments <br /> attributable to executed Construction Change Directives.) <br /> PCO Owner-3 (PR-001)Changes sanitary sewer routing and addition of temporary water and sanitary lines=$57,195.62 <br /> PCO Owner-4(PR-003)Changes to OCS and adjusting MH sizes. <br /> Total=$57,195.62 <br /> The original Guaranteed Maximum Price was $ 12,180,926.00 <br /> The net change by previously authorized Change Orders r; -32,470.88 <br /> The Guaranteed Maximum Price prior to this Change Order was $ 12,148,455.12 <br /> The Guaranteed Maximum Price will be increased by this Change Order in the amount of $ 57,195.62 <br /> The new Guaranteed Maximum Price including this Change Order will be $ 12,205,650.74 <br /> The Contract Time will be unchanged by Zero(0)days. <br /> The new date of Substantial Completion will be 8/12/22 <br /> NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract <br /> Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br /> Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. <br /> Kodet Architectural Group Ltd RIM Construction Elk River Municipal Utilities <br /> ARCHITECT(Firm name) r---DoeuSigned by: <br /> n name) OWNER(Firm name) <br /> 41 PK <br /> SIGNATURE ' 109c7e2027EC402...JIVMI SIGNATURE <br /> IVURC <br /> Edward Daniel Kodet Ill,AIA Kris Hahn Kri s Hahn - Prf rtc ve <br /> PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE <br /> 12/08/2021 12/8/2021 <br /> DATE DATE DATE <br /> AIA Document G701 —2017.Copyright©1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved. <br /> AIA ,ua AIA Cunt, -re registered trademark, may not be use <br /> This ocument <br /> was produced by AIA software at 13:06:08 ET on 12/07/2021 under Order No.6631446434 which expires on 08/13/2022,is not for resale,is licensed forone-time <br /> use only,and may only be used in accordance with the AIA Contract Documents',Terms of Service.To report copyright violations,e-mail copyright@aia.org. <br /> User Notes: <br /> (3B9ADA46) <br /> 137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.