Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br />Elk River Municipal Utilites <br /> <br /> <br /> <br />Waco Substation Bank #1 Circuit Switch Phase Transformer side terminal Pad <br /> <br /> <br />Inspection Summary <br /> <br />File name IR000453.IS2 Inspection Date and Time 6/10/2021 1:00:11 PM <br />Severity Critical 80 degrees over <br /> <br />Main Image Markers <br /> <br /> <br /> <br /> <br />Corrective Action: <br />Clean and Retorque Terminal Pad. <br />IR Inspection <br />Report <br /> <br /> <br /> <br />IR000453.IS2 <br />6/10/2021 1:00:11 PM <br /> <br /> <br />Visible Light Image <br />Name Temperature Emissivity Background <br />Centerpoint 180.8°F 0.95 44.6°F <br />130