My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.2. PCSR 03-04-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2021
>
03-04-2021 Special
>
3.2. PCSR 03-04-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:10:35 AM
Creation date
3/1/2021 10:06:51 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/4/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Action <br /> Cir•ci <br /> Elk - <br /> River= <br /> To Item Number <br /> Planning Commission 3.2 <br /> Agenda Section Meeting Date Prepared by <br /> Public Hearings March 4, 2021 Chris Leeseberg, Senior Planner <br /> Item Description Reviewed by <br /> Conditional Use Permit: Light Manufacturing- Zack Carlton,Planning Manager <br /> 10752 168th Circle, RJ Ryan Construction/ Reviewed by <br /> Meritex Elk River,LLC, Case No. CU 21-02 <br /> Action Requested <br /> Recommend, by motion, approval of the Conditional Use Permit with <br /> the following conditions to satisfy the standards set forth in Section _ <br /> 30-654: <br /> 1. The west access easement shown in the original site plan <br /> approval from October 2015 shall be recorded. <br /> CR 33 <br /> Background/Discussion <br /> The property is zoned FAST Subzone H where light manufacturing <br /> facilities require a Conditional Use Permit (CUP). x <br /> RR <br /> The applicant is seeking a CUP to construct an approximately 90,000 <br /> square foot addition to their existing 105,000 light manufacturing HWLI <br /> facility. - cR z <br /> The project meets the exterior design standards (precast concrete <br /> panels with a ribbed pattern matching the existing color) for the FAST ` <br /> - Subzone H zoning district and includes 82 trees which complies with <br /> the city's landscaping standards. ! y <br /> 'oma <br /> The setback and parking standards are satisfied under the submitted <br /> proposal. Access to the site will occur at three points along 168"' <br /> Figure I <br /> Avenue. <br /> The loading dock doors are located along the south side of the structure, opposite public streets. <br /> Applicable Regulations <br /> In approving a Conditional Use Permit,the council may impose such specific conditions with regard to the <br /> development or operation of the proposed use as it considers necessary to satisfy the seven standards set forth in <br /> Section 30-654 and the requirements contained in this article and to promote compatibility with and minimize any <br /> potentially adverse effects upon adjacent properties, the neighborhood or the city. <br /> The Elk River Vision P O N E R E o R Y <br /> A welcoming community avith revolutionary and spirited resourcefulness, exceptional INAWR <br /> service, and community engagement that encourages and inspires prosperity. Updated.August 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.