Laserfiche WebLink
UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU Commission Chris Kerzman –Engineering Manager <br />MEETING DATE: AGENDA ITEM NUMBER: <br />March 10, 2020 5.3 <br />SUBJECT: <br />Bids for 7.5 MVA GSU Transformer <br />ACTION REQUESTED: <br />Award the contract for the 7.5 MVA GSU Transformer <br />BACKGROUND: <br />To prepare for the construction of the new Field Services Building, the existing power plant <br />substation needs to be relocated. This substation is needed to step the voltage from the diesel <br />engine generators of 4.16 kV up to ERMU’s distribution voltage of 12.47 kV. The transformer is <br />the longest lead time component needed for relocation of the substation to the northwest <br />corner of the power plant. The transformer is the only component of this substation that is <br />expected to be subject to competitive bidding law. ERMU plans to move forward with the <br />remainder of the design after award of the transformer bid. <br /> <br />DISCUSSION: <br />The bid opening is scheduled for March 9, 2020 at 10:00 a.m. The bid tabulation and letter of <br />recommendation from Power System Engineering will be provided at the time of the meeting <br />and a recommendation will be made. <br /> <br />FINANCIAL IMPACT: <br />The cost will be presented at the time of the meeting. <br /> <br />______________________________________________________________________________ <br />Page 1 of 1 <br />74 <br />