Laserfiche WebLink
HANDOUT AT MEETING <br /> Elk River Municipal Utilities-7.6/8.4 MVA GSU Transformer Bid Tabulation 3/10/20 <br /> Manufacturer Purchase Price No Load Loss(W) Load Loss(W) Extended Price Delivery(Lead Time) <br /> ABB $ 190,340 6500 41500 $ 322,805 16-18 wks ARO <br /> WEG $ 130,500 5899 43151 $ 261,693 32-34 wks ARO <br /> Prepared by Power System Engineering 3-10-20 <br />