My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. PCSR 02-25-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2020
>
02-25-2020
>
5.3. PCSR 02-25-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 11:44:30 AM
Creation date
2/21/2020 10:55:22 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Action <br /> <br /> <br /> <br /> <br />To Item Number <br />Planning Commission 5.3 <br />Agenda Section Meeting Date Prepared by <br />Public Hearings February 25, 2020 Zack Carlton, Planning Manager <br />Item Description Reviewed by <br />Trout Ridge Run PUD – PID 75-879-0010 Chris Leeseberg, Senior Planner <br /> Zone Change from R-1c to Planned Unit <br />Reviewed by <br />Development (PUD), Case No. ZC 20-01 <br /> <br /> Conditional Use Permit to establish a PUD for <br />a 6-lot residential subdivision, Case No. CU 20- <br />05. <br /> Preliminary Plat of Trout Ridge Run, Case No. <br />P 20-01 <br /> <br />Action Requested <br />Recommend, by motion, approval of the zone change from R-1c <br />(Single Family) to Planned Unit Development (PUD), with the <br />condition that a PUD agreement must be approved by the City <br />Council prior to recording the Zone Change. <br /> <br />Recommend, by motion, approval of the Conditional Use Permit <br />establishing a residential Planned Unit Development, with the <br />following conditions: <br />1. Side yard setbacks shall be 7.5 feet. <br />2. Minimum garage size shall be 633 square feet. <br />3. The city will not maintain the proposed stormwater <br />infrastructure along the west side of proposed homes and <br />between lots 2 and 3. <br />4. Update pipe material to ensure there is enough strength to <br />support maintenance vehicle traffic. <br />5. Submit a stormwater maintenance agreement that clearly <br />outlines maintenance responsibilities of the stormwater <br />infrastructure. <br />6. Timing and location of all utility connections beneath Tyler <br />Street will need to be approved by the Public Works Director <br />prior to construction and may require an escrow to ensure <br />the work is completed to city standards. <br />7. Staff must approve all plans associated with the utility <br />connections prior to construction. <br /> <br />The Elk River Vision <br />A welcoming community with revolutionary and spirited resourcefulness, exceptional <br />service, and community engagement that encourages and inspires prosperity <br />
The URL can be used to link to this page
Your browser does not support the video tag.