My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1 ICESR 08-21-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2018
>
08-21-2018
>
7.1 ICESR 08-21-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 11:26:18 AM
Creation date
8/16/2019 11:26:18 AM
Metadata
Fields
Template:
City Government
type
ICESR
date
8/21/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coy of <br />Elk „ :, <br />River <br />Request for Action <br />To <br />Item Number <br />Ice Arena Commission <br />7.1 <br />Agenda section <br />Meeting Date <br />Prepared by <br />Community Center <br />August 21, 2018 <br />Rich Czech, Arena Manager <br />Item Description <br />Reviewed by <br />Multipurpose Center/Arena Update <br />Cal Portner, City Administrator <br />Reviewed by <br />Action Requested <br />Discuss the status of the Multipurpose Center/Arena. <br />Background/Discussion <br />OnJuly 16, 2018, the Council adopted a resolution outlining their intent to hold a General F cction <br />referendum fora local option sales tax (if 0.5'!,o to pay for $35 million in recreation facility and parr <br />improvernents. `l'he motioned carried 5 — 0. <br />'I'.he improvements include: <br />$26 million Multipurpose Facilit� (arena/fieldhouse/meeting-cN eut space) <br />S 1.5 million Senior Center I �aciiity <br />S1 i-nillion Lake Orono Dredging <br />52 million 'Trails <br />52.5 million bake Orono Pari: <br />52 million Youth Athletic Complex <br />Council is now considering whether to acid space for senior sen -ices in the facility or to remodel the <br />current Activity Center. If successful, ice would be kept in The Olympic Rink during construction of the <br />two nein rinks and one of the new rinks would likely be up by the start of the 2019-20 season. <br />The question will be on Noti•cmber G General Flection 13a1[ot. If the question fails, the scope of the <br />improvements will be reduced to $16 million for the replacement of The Barn Rink and The Olympic <br />Rink refrigeration system and S1 million foi- dredging bake Orono. <br />The $17 million improvements would be financed through bonds paid by property taxes. <br />During this phased construction, there would likely be no ice in the summer of 2019 anal one rink open <br />for the 2019-20 season with portable locker rooms and restrooms. <br />Financial Impact <br />N/A <br />Attachments <br />None <br />P© V i H 1 0 B r <br />N"ATUREJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.