Laserfiche WebLink
1� � <br />City of <br />Elk - . <br />River <br />Request for Action <br />To 78, <br />em Number <br />Arena Commission <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Arena Manager's Update <br />August 21, 2018 <br />Rich Czech, Arena Man!ger <br />Item Description <br />Reviewed by <br />Arena Manager's Update <br />Cal Portner, City Administrator <br />Reviewed by <br />Action Requested <br />Receive information. <br />Background/Discussion <br />Upcoming Events: <br />■ Midwest Hockey Tournament August 26 & 27 <br />■ Fall Annual Craft Fair -September 15 &16 <br />■ Ice in the Barn September 20 <br />Completed Summer Projects <br />■ Removed levelers from the north end of the Olympic rink. <br />Cleaned and painted the lobby walls. <br />Top ends rebuilt on compressors; Barn # 2/Olyinpic # 1. <br />01 m is Ice Plant <br />This summer, we repaired five leaks on the Olympic ice plant, two were of significant in size. Due to <br />these leaks, we have put 1,600 pounds of refrigeration into the system. Even with regular leak checks, <br />leaks are hard to detect because they can be very small at first and can leak several pounds of refrigeration <br />before detected. Due to the age of the systems, the system could be leaked -checked one day and a leak <br />could arise the next. <br />Financial Impact <br />N/A <br />Attachments <br />N/A <br />p 0 W E 0 E I IT <br />IL a <br />vmATUR <br />