My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5c PCSR 03-28-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2017
>
03-28-2017
>
6.5c PCSR 03-28-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 9:42:01 AM
Creation date
3/23/2017 4:38:32 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/28/2017
case
CU 17-08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E lls <br />River <br />Request for Action <br />To <br />Item Number <br />Planning Commission <br />6.5c <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Public Heari n s <br />March 28, 2017 <br />Chris Leeseber , Senior Planner <br />Item Description <br />Reviewed by <br />Beaudry Oil /Truck Shop — 620, 634 Quinn Ave. & <br />Zack Carlton, Planning Manager <br />623 & 633 Proctor Ave. <br />Reviewed by <br />■ Conditional Use Permit to establish a truck <br />storage, maintenance, and repair facility, Case <br />No. CU 17 -08 <br />Action Requested <br />Recommend, by motion, approval of the Conditional Use Permit with the following conditions: <br />1. The authorized Conditional Use Permit will not be recorded until the associated Zone Change <br />and Plat have been recorded. <br />2. Building permits for the described work will not be issued until the Conditional Use Permit is <br />recorded. <br />3. If the proposed work described in the application and Conditional Use Permit has not been <br />substantially completed within two years after the Conditional Use Permits date of issuance, the <br />permit shall expire and become void. <br />4. If the authorized use ceases for more than six months, the Conditional Use Permit shall expire. <br />5. The applicant must apply for and receive approval for all required permits before any <br />construction may begin. <br />6. Curbs at abandoned driveways on Proctor Road shall be replaced with concrete barrier style <br />curbing. <br />7. The site will need to comply with Chapter 57 of the MN State Fire Code. <br />8. If outdoor storage is desired, an amendment to the Conditional Use Permit will be required. <br />9. All sources of artificial lights shall be so fixed, directed, designed or sized that the minimum <br />subtotal of their illumination will not increase the level of illumination on any nearby residential <br />property by more than 0.1 footcandle in or within 25 feet of a dwelling or by more than 0.5 <br />footcandle on any part of the property. <br />Background /Discussion <br />The property is zoned I2 (Medium Industrial) and C4 (Community Commercial) and the applicant is <br />seeking approval of a preliminary plat (P 17 -03) and zone change (ZC 17 -03) to operate a bus, truck and <br />implement storage, maintenance and repair facility, which requires a Conditional Use Permit (CUP). <br />The applicant proposes to construct a 7,216 square foot (88' x 82') one story facility to operate Beaudry <br />Oil & Propane. The facility will be used for minor repairs to the fleet (not open to the public), which <br />includes oil changes, replacing tires, changing brakes, minor service, light maintenance, cleaning and <br />detailing. There will be no heavy motor overhauls or outside storage. The site will provide outdoor <br />parking for 28 company delivery trucks. <br />P0WE6EU AY <br />IV <br />
The URL can be used to link to this page
Your browser does not support the video tag.