My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2 PCSR 03-28-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2017
>
03-28-2017
>
6.2 PCSR 03-28-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 2:21:22 PM
Creation date
3/23/2017 2:11:55 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/28/2017
case
CU 17-04 ZC 17-04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E lls <br />River` <br />Request for Action <br />To <br />Item Number <br />Planning Commission <br />6.2 <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Public Hearings <br />March 28, 2017 <br />Zack Carlton, Planning Manager <br />Item Description <br />Reviewed by <br />Pat Briggs — 6th Street and Jackson Ave NW <br />Chris Leeseber , Senior Planner <br />Reviewed by <br />• Zone Change from R -4 (Multi Family <br />Residential) to PUD, Case No. ZC 17 -04 <br />• Conditional Use Permit to establish a PUD for <br />an apartment building, Case No. CU 17 -04 <br />Action Requested <br />Recommend, by motion, approval of the zone change for PID 75- 134 -2303, changing the zoning from R- <br />4 (Multi - Family Residential) to Planned Unit Development (PUD). <br />Recommend, by motion, approval of the Conditional Use Permit (CUP) to establish a PUD for an <br />apartment building, with the following conditions: <br />1. Approval of the CUP does not constitute building permit approval. The applicant must apply <br />for and receive approval of a building permit before construction may begin. <br />2. The CUP will not be recorded until the Zone Change has been filed with the county. <br />3. Staff approval of updated landscape, grading, stormwater, site plans, and building elevations. <br />4. A PUD agreement shall be drafted and approved by the City Council prior to issuance of a <br />building permit. <br />5. If the proposed work described in the application and Conditional Use Permit has not been <br />substantially completed within two years after the Conditional Use Permits date of issuance, the <br />permit shall expire and become void. <br />Background /Discussion <br />Pat Briggs, owner of the property located at the southwest corner of 6`h Street and Jackson Ave, has <br />requested a zone change and a CUP to allow establishment of a PUD for development of a 40 -unit <br />apartment building. The property was recently rezoned to R -4, which supports the desired use, but due to <br />restrictions on the site, the applicant is requesting to utilize the PUD process for his residential uses. <br />The applicant proposes a mix of one, two, and three bedroom apartments. Every apartment will have a <br />full appliance package including dish washer, clothes washer and dryer. A ground level parking garage <br />provides one parking stall per apartment. The proximity to Lions Park also provides nearby recreational <br />opportunities for residents. <br />Analysis <br />Site Plan <br />The apartment complex is located in the center of an existing parcel at the southwest corner of 6`h Street <br />and Jackson Ave. All access will come from two driveways off of 6`h Street and no access will be <br />permitted to Jackson Ave. <br />4A UO'E <br />
The URL can be used to link to this page
Your browser does not support the video tag.