Laserfiche WebLink
E lls <br />River` <br />Request for Action <br />To <br />Item Number <br />Planning Commission <br />6.1 <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Public Hearings <br />March 28, 2017 <br />Zack Carlton, Planning Manager <br />Item Description <br />Reviewed by <br />Spectrum High School —17823 Industrial Circle <br />Chris Leeseber , Senior Planner <br />■ Conditional Use Permit to Establish an <br />Reviewed by <br />Institutional Use, Case No. CU 17 -07 <br />Action Requested <br />Recommend, by motion, approval of the Conditional Use Permit (CUP) with the following conditions: <br />1. The applicant must apply for and receive approval for all required permits before any <br />construction may begin. <br />2. Capacity of the school, combination of all three facilities (17796 Industrial Circle, 11044 Industrial <br />Circle, and 17823 Industrial Circle) within the industrial park, shall not exceed 1,000 students. <br />3. No school related parking shall be permitted on the adjacent public street. <br />4. Due to the industrial nature of the neighborhood, the school recognizes that noise, odors, truck <br />traffic, and other undesirable effects may be present. <br />5. Fees, as determined by the applicant and city, shall be collected in lieu of taxes for a period of <br />four years. <br />Background /Discussion <br />The applicant is seeking approval of a CUP to establish an Institutional Use (school) at 17823 Industrial <br />Circle. The subject property is zoned Business Park (BP) where schools are listed as a conditional use. <br />In 2011 the applicant received a CUP to operate a school at 17796 Industrial Circle, and in 2014 they <br />received approval for a second location at 11044 Industrial Circle for a sixth grade facility, and expansion <br />of their previous student cap. They are now seeking to expand into a third location, further expanding <br />educational opportunities, and relocating grades seven and eight. The expansion also proposes to increase <br />the student cap for all of Spectrum's facilities to 1,000 students, add gym space, and sets aside space for a <br />future auditorium and athletic facility. <br />The location operated as WS Packaging until recently, and Spectrum will purchase the property, which <br />includes a large open area on the south half of the lot, if the CUP is approved. <br />Site Plan <br />The site is developed and includes a parking lot on the north and west sides of the building. A loading <br />dock and paved parking area is located in the rear (east) side of the building. And the south half of the lot <br />is currently undeveloped. The current application includes a gym addition on the east side of the building. <br />The expansion will need to comply with all city ordinances, including setbacks, stormwater management, <br />and fire lane access. <br />4A UR <br />