Laserfiche WebLink
r' <br /> i,ikk .� Request for Action <br /> River <br /> To Item Nur <br /> Parks and Recreation Commission Click here3ext. <br /> Agenda Section Meeting Date Prepared by <br /> Action Items August 10,2016 Tim Sevcik,Parks Superintendent <br /> Item Description Reviewed by <br /> Rivers Edge Commons —Dock Project Cal Portner, City Administrator <br /> Reviewed by <br /> Michael Hecker,Parks and Recreation Director <br /> Action Requested <br /> Recommend,by motion,whether or not any dock or fishing pier structure at Rivers Edge Commons <br /> must be constructed to meet Americans with Disabilities Act construction standards. <br /> Recommend,by motion,establishing October 31,2016, as the no later than date for the Downtown <br /> Rivers Edge Business Association group to respond to all staff questions regarding feasibility of placing a <br /> dock within Rivers Edge Commons. <br /> Background/Discussion <br /> The Rivers Edge Commons dock project was presented to the City Council by Annie Deckert and Fred <br /> McCoy as representatives of the Downtown Rivers Edge Business Association on April 4,2016, during <br /> work session. The group proposed installing a dock along the Mississippi River within Rivers Edge <br /> Commons as part of the expansion of the park. Council directed staff to assist the group as they develop <br /> a proposal. Additionally, council proposed the following questions: <br /> • Costs and staff time required for installing and removing the dock each year; <br /> • annual maintenance expenses; <br /> • location of storage during winter months; <br /> • where funds would be obtained for the purchase and maintenance of the dock. <br /> Staff met with Annie Deckert on May 10, 2016,and discussed the Council direction and proposed the <br /> following questions to be answered by the group: <br /> • Develop a design to meet ADA accessibility requirements: <br /> • Option 1 would be to construct an elevated ramp platform on concrete footings to <br /> minimize disturbance to the current shoreline; <br /> • Option 2 would be to construct a paved ramp along the shoreline;this option is less <br /> desired as it would require substantial disturbance to the shoreline. <br /> • Develop a maintenance plan to include installation and removal and determine if volunteers or <br /> staff would conduct these activities; <br /> • Conduct a survey to determine depth of water along the shoreline to include the ordinary high <br /> water mark to a minimum distance of 10 feet beyond the end of the proposed dock design to <br /> determine feasibility; <br /> • Propose design options describing the type of dock and ramp including materials type; <br /> • Develop construction documents for city review; <br /> • Provide a budget and funding source (Council indicated no city funding for the project); <br /> FI ■ EIEI 11 <br /> NATURE <br />