My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3B PCSR 07-26-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
07-26-2016
>
4.3B PCSR 07-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 4:37:43 PM
Creation date
7/21/2016 4:27:03 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
7/26/2016
case
CU 16-20
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City;'( .,� Request for Action <br /> River <br /> To Item Number <br /> Planning Commission 4.3b <br /> Agenda Section Meeting Date Prepared by <br /> Public Hearings July 26,2016 Chris Leeseberg, Senior Planner <br /> Item Description . Reviewed by <br /> Sherburne County— 13880 Business Center Drive Zack Carlton,Planning Manager <br /> NW Reviewed by <br /> • Conditional Use Permit for Government <br /> Building,Case No. CU 16-20 <br /> Action Requested <br /> Recommend,by motion, approval of the Conditional Use Permit with the following conditions: <br /> 1. The authorized Conditional Use Permit shall not be recorded until all conditions have been <br /> completed. <br /> 2. The authorized use shall not begin until the Conditional Use Permit is recorded. <br /> 3. The applicant must apply for and receive approval for all required permits before any <br /> construction may begin. <br /> 4. Elk Path Business Center 5th Addition shall be platted prior to releasing the CUP for recording. <br /> 5. All utility equipment shall meet the standards set forth in Section 30-1294 (e)(3). <br /> 6. Sanitary sewer modifications shall provide for grinding of all illegal discharges from the subject <br /> property. <br /> 7. All comments in the Environmental Memo dated July 1,2016 shall be addressed. <br /> 8. All comments in the Engineering Memo dated July 6,2016 shall be addressed. <br /> 9. All comments in the Stormwater Coordinator Memo dated July 7,2016 shall be addressed. <br /> Background/Discussion <br /> The property is zoned Business Park (BP) and the applicant is seeking a Conditional Use Permit (CUP) to <br /> construct an addition and renovate the Sherburne County Government Center located at 13880 Business <br /> Center Driver,Case No. CU 16-20. <br /> As part of this application, the applicant has submitted an application to plat the Elk Path Business <br /> Center 5th Addition for their government center expansion. The plat will consist of Lot 1 (32.13 acres), <br /> Outlot A (8.15 acres),and Oudot B (33.89 acres). <br /> Analysis <br /> Comprehensive Plan <br /> The subject property has a land use designation of industrial with a zoning of BP. The proposed use is <br /> consistent with both the comprehensive plan as well as the zoning district. <br /> Transportation/Circulation <br /> An additional access point is being proposed onto Business Center Drive west of the existing public <br /> access. When the project is complete, the existing public access will become an exit only. Staff is <br /> iEIEI 1 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.