Laserfiche WebLink
Cit of <br /> _ Request for Action <br /> River <br /> To Item Number <br /> Planning Commission 6.1 <br /> Agenda Section Meeting Date Prepared by <br /> Public Hearing February 23, 2016 Chris Leeseberg, Senior Planner <br /> Item Description Reviewed by <br /> Cornerstone Auto Elk River— 17219 U.S. Highway Zack Carlton,Planning Manager <br /> 10 Conditional Use Permit for building addition, Reviewed by <br /> Case No. CU 16-04 <br /> Action Requested <br /> Recommend, by motion,approval of the Conditional Use Permit (CUP) with the following conditions: <br /> 1. The Conditional Use Permit shall not be recorded until all applicable conditions have been <br /> substantially completed. <br /> 2. The authorized use shall not begin until the Conditional Use Permit is recorded. <br /> 3. If the authorized use ceases for more than six months, the Conditional Use Permit shall expire. <br /> 4. The Conditional Use Permit is not a building permit and the applicant must apply for and receive <br /> approval of required building and sign permits before construction may begin. <br /> 5. The building shall meet all building and fire codes. <br /> 6. The Fire Chief shall verify the location of all fire hydrants, and may require additional hydrants <br /> necessary to preserve the health and safety of the residents. <br /> 7. All comments in the Stormwater Coordinator Memo dated February 3, 2016 shall be addressed. <br /> 8. All sources of artificial lights shall be so fixed, directed, designed or sized that the minimum <br /> subtotal of their illumination will not increase the level of illumination on any nearby residential <br /> property by more than 0.1 footcandle in or within 25 feet of a dwelling or by more than 0.5 <br /> footcandle on any part of the property. <br /> 9. All comments in the Minnesota Department of Transpiration memo dated February 18, 2016 <br /> shall be addressed. <br /> Background/Discussion <br /> The property is zoned C-3 Highway Commercial where car, truck, RV, and marine sales and services <br /> require a Conditional Use Permit (CUP). <br /> The applicant is seeking a CUP to construct multiple additions to their car dealership which will complete <br /> their final phase of the expansion project. The submitted plans have been modified from what was <br /> originally proposed in 2006 with the building footprint smaller. Some of the areas that were identified as <br /> building in 2006 will now be parking. <br /> Analysis <br /> Building Expansion <br /> The proposal is to expand three separate areas of the existing building. In the northwest corner a new <br /> 8,162 square foot section for office and showroom,in the northeast corner a 4,280 square foot parts area <br /> and heavy truck service, and 12,126 square foot expansion of their service lane and new oil express in the <br /> southeast corner. <br /> P B N E H E ® ® 1 <br /> NATURE <br />