My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1e. ERMUSR 11-17-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2015
>
11-17-2015
>
6.1e. ERMUSR 11-17-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2015 3:55:29 PM
Creation date
11/16/2015 3:55:29 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Eric Volk-Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> November 17,2015 6.1 e <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Delivered nine new residential water meters. <br /> • Sealed the water meter, and took curb stop ties from six water services. <br /> • Went on eight service calls. <br /> • Completed 25 BACTIITotal Chlorine Residual Samples <br /> o All confirmed negative for Coliform Bacteria. <br /> • Completed 20 routine fluoride samples <br /> o All samples met MDH standards. <br /> • On October 14,the Water Department lowered Lake Orono and completed the annual <br /> inspection of the Orono Dam. A few deficiencies will need some attention in the future. I <br /> will complete a report and send it to the city so they can develop a future plan. <br /> • I will be hand-delivering letters to all of our commercial customers who own a private <br /> hydrant that are not yet on our private hydrant maintenance program. Out of the 225 <br /> private hydrants we've identified, 164 private hydrants are currently on our program. <br /> • Troy and I met with SEH for the design of Filter#9. As soon as the plans are finalized, I <br /> will be giving the commission an update. <br /> • SEH has completed the pilot study for Filter#9. The recommendation for the type of <br /> filter media and the chemicals required will be included with the plans for the new filter. <br /> • We are still working on getting Well#5 up and running. The excessive heat the motor <br /> generated seems to have done more damage than initially thought. <br /> • The Water Operators have continued to repair fire hydrants identified during the <br /> preventative maintenance. To the best of our knowledge, we are at 100%in service rate <br /> for our fire hydrants. Three hydrants were also repaired due to cars hitting them. One <br /> hydrant was hit so hard that it flew approximately thirty feet into the adjacent AutoZone <br /> parking lot. Attached is a photo of the hydrant. <br /> • Angela Hauge continues to validate all of our GIS based water maps. This will help to <br /> ensure that all valves are located on the proper water mains and that there are no valves <br /> or hydrants missing from the map. <br /> PBNEBEB B1 <br /> Page 1 of 2 NAIUR <br /> Reliable Public <br /> Power Provider P OWERED T o S ERV E <br /> 170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).