My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1e. ERMUSR 11-17-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2015
>
11-17-2015
>
6.1e. ERMUSR 11-17-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2015 3:55:29 PM
Creation date
11/16/2015 3:55:29 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Dave Ninow has been working on getting backwash meters for Well#2 and#3. As we <br /> currently send our backwash to the sanitary sewer system,these meters will help ensure <br /> we accurately account, and pay for the water backwashed to the wastewater department. <br /> • We completed the final walkthrough for the Gary Street Water Tower interior <br /> reconditioning. During the process, the Northstar Commuter Rail antennas were removed <br /> from the top of the tower. As part of the project, we had the exterior of the tower washed. <br /> We still have to install the mixer and the new fall protection. After all of the work is <br /> complete, we'll ask the Fire Department for help washing out the inside of the tower to <br /> put the tower back into service. Attached are pictures of the reconditioning project. <br /> • Verizon Wireless is still revising their plans to install antennas on the Auburn Street <br /> Water Tower. Verizon Wireless has also approached us about adding six more antennas <br /> to the top of Gary Street Tower. This request will initiate a plan review and an <br /> amendment to the current contract. <br /> • We had Ben Totzke shadow our water operators October 26-30. Ben is an intern from St. <br /> Cloud's Technical College Water Environmental Technologies (WET) Program. <br /> ATTACHMENTS: <br /> • October Pumping by Well <br /> • October 2015 Daily Temperature Graph <br /> • October 2015 Accumulated Precipitation Graph <br /> • Photo—Hydrant by AutoZone <br /> • Photos—Gary Street Water Tower Reconditioning Project <br /> POWERED BY <br /> Page 2 of 2 NATURE <br /> Reliable Public <br /> Power Provider P 0WE 0.E D TO S ERV E <br /> 171 <br />
The URL can be used to link to this page
Your browser does not support the video tag.