My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.e. ERMUSR 08-11-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
08-11-2015
>
6.1.e. ERMUSR 08-11-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2015 8:52:51 AM
Creation date
8/13/2015 10:31:09 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/11/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Eric Volk-Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> August 11, 2015 6.1e <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Mike Langer will be receiving the MMUA Rising Star Award at the MMUA Summer <br /> Conference Awards banquet on August 18. His dedication to the community and his <br /> pursuit of perfection is the reason he will be receiving the Rising Star Award. <br /> • Delivered nine new residential water meters, and the new water meter for Coachman <br /> Ridge Apartments. <br /> • Sealed the water meter, and took curb stop ties from nine water services. <br /> • Turned on one water service, and one electric service. <br /> • Went on five service calls. <br /> • Completed 25 BACTI/Total Chlorine Residual Samples <br /> o All confirmed negative for Coliform Bacteria. <br /> • Completed 20 routine fluoride samples <br /> o All samples met MDH standards. <br /> • We received multiple quotes from engineering firms for the Well#9 filter design that will <br /> start this fall. After one of the firms decided to pull their quote, we chose SEH who had <br /> the next lowest bid. The design will begin sometime in August and will go out for bids in <br /> January 2016. <br /> • Oliver Engineering will be moving forward with a survey of the Field Services Building <br /> Property. At the same time, Kjolhaug Environmental Services will be completing the <br /> wetland delineation of the property. Both of these things need to be done in order to <br /> complete the field services space needs study. <br /> • The water operators are moving along nicely with annual hydrant maintenance. They <br /> should be done within the next month. <br /> • We had two new fire hydrants installed on County Road One. They were installed in <br /> conjunction with the county resurfacing project. Attached are the pictures. <br /> • Verizon has decided to attach antennas to the Auburn Street Water Tower. The <br /> installation should happen over the next six months. <br /> — P0wE8ED BY <br /> nir$ Page 1 of 2 NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D T o S E R V E <br /> 196 <br />
The URL can be used to link to this page
Your browser does not support the video tag.