My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.C.4. PRSR 4-10-2002
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2001-2010
>
2002
>
04-10-2002
>
9.C.4. PRSR 4-10-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2014 9:49:20 AM
Creation date
6/26/2014 9:49:19 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
4/10/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #9.C.4. <br /> Elk <br /> River <br /> MEMORANDUM <br /> TO: Park and Recreation Commission <br /> FROM: Michele McPherso Director of Planning <br /> DATE: April 10, 2002 <br /> SUBJECT: Review Fresno Playground Options <br /> Attachments <br /> • Location Map <br /> • Playground Design Option A <br /> • • Playground Design Option B <br /> • Playground Design Option C <br /> • September 27, 2001 Cost Estimates - Options A & B <br /> • April 4, 2002 Cost Estimates - Options C & B <br /> Analysis <br /> In October 2001,the Commission reviewed playground designs for Fresno Park. These <br /> were developed as a result of neighborhood requests for additional park amenities other than <br /> the full-court basketball court. As part of the 2002 Capital Improvements Budget,the City <br /> Council approved an expenditure of$25,000 for playground equipment and other <br /> improvements to Fresno Park. <br /> The subcommittee assigned to review the budget items and their timing suggests that an <br /> alternative plan be considered that would lessen the duplication of equipment in parks that <br /> are in close proximity to each other and reduce the overall expenditure for equipment at <br /> Fresno Park. <br /> Review of Options <br /> Option A <br /> Option A included a set of swings,a preschool structure(for kids under 5 years old), <br /> a play booster structure(for kids 5- 12),and spring riders. This option proposed to <br /> include all the equipment within a rectangular-shaped play area with radius corners. <br /> The estimate for this option totaled $20,935 on September 27th. <br />
The URL can be used to link to this page
Your browser does not support the video tag.