My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.C.4. PRSR 4-10-2002
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2001-2010
>
2002
>
04-10-2002
>
9.C.4. PRSR 4-10-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2014 9:49:20 AM
Creation date
6/26/2014 9:49:19 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
4/10/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fresno Playground Options <br /> April 10,2002 <br /> Page 2 <br /> 410 <br /> Option B <br /> Option B, also reviewed in October, proposed a set of swings, a play booster <br /> structure and super scoops, also in a semi-rectangular area. However, the super <br /> scoops would be set in their own sand play box area. The total cost on September <br /> 27th for this option was $22,477. The April 4th estimate for Option B reduced the <br /> cost to $22,465. <br /> Option C <br /> Option C has been scaled back to include a set of swings,two super scoops,and two <br /> spring riders as well as a preschool structure. The total cost for this equipment <br /> would be$9,319. This park would then be geared to younger children under the age <br /> of five, with the understanding that older children would utilize the playground <br /> structures located at Mississippi Oaks, Country Crossing, and Orono Parks. <br /> Acknowledging that,in order to access either of these facilities,they would have to <br /> cross Mississippi Road,Joplin Street, or Orono Parkway. <br /> Recommendation <br /> Staff requests that the Commission provide direction to staff regarding which playground <br /> option to implement. The neighborhood's preference was for Option B. The <br /> neighborhood has not been informed of Option C. We would like to order equipment as <br /> • soon as possible in order to complete installation mid-summer. <br /> • <br /> S:\PLANNING\MICHMC\PARKNREC\FresnoPark2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.