Laserfiche WebLink
i <br /> Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission David Berg - Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice-Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> November 12, 2013 2.6 <br /> SUBJECT: <br /> Water Tower Attachment Engineering Inspection Quote <br /> DISCUSSION: <br /> Verizon Wireless has provided water tower attachment plans for ERMU review. The cost of <br /> engineering and legal review for the attachments would be reimbursed by Verizon Wireless per <br /> ERMU's attachment agreement. ERMU has received the quote from Badger State Inspection for <br /> the engineering review and inspections for the proposed Verizon Wireless antenna attachments <br /> on ERMU's Gary Street and Johnson Street Water Towers. The quote for review and inspection <br /> relating to the Gary Street site is $11,428 and $1 3,770 for the Johnson Street site. These quotes <br /> are attached. <br /> ACTION REQUESTED: <br /> • Commission approval of the BSI Proposal for the Verizon Wireless projects at the Gary Street <br /> and Johnson Street Water Towers. <br /> ATTACHMENTS: <br /> • Badger State Inspection proposal for review and inspection for the new Verizon Wireless antenna <br /> installation on the ERMU Gary Street Water Tower. <br /> • Badger State Inspection proposal for review and inspection for the new Verizon Wireless antenna <br /> installation on the ERMU Johnson Street Water Tower. <br /> f e M i A t 0 I I <br /> WI Iltk 3 Page 1 of 1 INATURIEI <br /> Reliable Public <br /> Power Provider P OwERED To S FRYE <br /> 48 <br />