Laserfiche WebLink
BADGER STATE INSPECTION. LLC <br /> Water Tower Specialist/Antenna, Evaluations, Inspection <br /> P.O.Box 157 Osseo,WI 54758 715-533-8686 <br /> October 10, 2013 <br /> By E-Mail only <br /> Mr. Troy Adams, P.E. <br />• Utilities Director <br /> Elk River Municipal Utilities <br /> 13069 Orono Parkway <br /> Elk River, Minnesota 55330-0430 <br /> RE: Proposal Review and Inspection for the New Verizon Antenna Installation on the 1,000,000 Gallon <br /> Gary Street Water Tower Located in Elk River, Minnesota. <br /> VERIZON PROJECT NUMBER: 20130877877 SITE NAME: MINC CHEWBACCA <br /> Dear Mr. Adams; <br /> This letter is to confirm the above referenced project estimated costs as follows: <br /> Antenna Review Fixed Fee $1,500.00 <br /> Structural Review Fixed Fee $300.00 <br /> Shop inspection (4 trips) Fixed Fee $2,100.00 <br /> Weld inspection (2 trips) Fixed Fee $1,034.00 <br /> Field Painting (6 trips) Fixed Fee $3,376.00 <br /> Preconstruction meeting and final Inspection Fixed Fee $1,768.00 <br /> Project Management/Clerical Fixed fee $1,350.00 <br /> Overall Project cost $11,428.00 <br /> If additional inspections are required or BSI is called for a site visit and the contractor is not ready, this site <br /> visit will be charged on a time and material basis. <br /> Please sign and date this letter to back to Badger State Inspection LLC. BSI cannot proceed with work on <br /> this project until we receive a signed contract. If you have any questions please call me at 715-533-8686. <br /> Please e-mail the signed proposals to kmulhern®badgerstateinspection.com <br /> Troy Adams P.E. ERMU Date <br />• 49 <br />