My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6 PCSR 01-14-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2014
>
01-14-2014
>
4.6 PCSR 01-14-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 11:13:13 AM
Creation date
1/10/2014 10:47:01 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/14/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cft <br /> ,.� Request for Action <br /> River <br /> To Item Number <br /> Planning Commission 4.6 <br /> Agenda Section Meeting Date Prepared by <br /> Planning Items January 14, 2014 Chris Leeseberg,Park Planner-Planner <br /> Item Description Reviewed by <br /> Request by Tiller Corporation for to amend Jeremy Barnhart,Deputy Director, CODD <br /> Conditional Use Permit for Mineral Excavation and Reviewed by <br /> Hot-Mix Plant, Case No. CU 14-03 -Public <br /> Hearing <br /> Action Requested <br /> Recommend, by motion, approval of the Conditional Use Permit (CUP) amendment with the <br /> following conditions: <br /> 1. The applicant shall execute a Conditional Use Permit Agreement outlining the terms and <br /> conditions of approval of the mining operations. <br /> 2. A mineral extraction license shall be obtained annually. <br /> 3. The following conditions shall be addressed to the satisfaction of the City's <br /> environmental consultant: <br /> a) The anticipated groundwater elevation at the site is anticipated to range from 954 on <br /> the east and 951 on the west. The applicant shall provide complete references for <br /> available groundwater elevations. The applicant must also address the use of the <br /> historic high groundwater levels in establishing the excavation basegrades. The <br /> "Excavation Plan", C2 must be modified to reflect these anticipated groundwater <br /> elevations. <br /> b) The plan of operation does not identify where the phasing of mining (and <br /> reclamation)will occur and the timing for each phase. The Site must be excavated <br /> in an orderly fashion to reduce the area of open mining at any one time. In <br /> particular, it is recommended that the northern portion of the Site be reclaimed prior <br /> to initiation of mining in the new parcel proposed for the expansion. The future <br /> location of the main operations area and office, now located in the southeast corner <br /> of the northern parcel, must be identified on the (phasing) Excavation Plan, C2. The <br /> Excavation Plan must also show the locations of topsoil and backfill soils which will <br /> be used in reclamation. The soil volumes of the anticipated phases must be <br /> indicated in the application and on the Excavation Plan. This information shall be <br /> submitted by March 1, 2014. <br /> c) The details for screening berms on the north side of 221st Street must be provided. <br /> The suitability of the berms for site screening must be further demonstrated by the <br /> applicant. Details have not been provided on security fencing for the new parcel in <br /> the southern portion of the Site. <br /> retEREil Br <br /> NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.