My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5 PCSR 06-12-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2012
>
06-12-2012
>
4.5 PCSR 06-12-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 11:15:37 AM
Creation date
6/7/2012 2:27:50 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/12/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />ver <br />TO ITEM NUMBER <br />Plannin Commission 4.5 <br />AGENDA SECTION MEETING DATE PREPARED BY <br />Planning June 12, 2012 Jeremy Barnhart, Planning Manager <br />ITEM DESCRIPTION REVIEWED By <br />Request by AutoZone for Site Plan approval to allow auto parts erem Barnhart, Plannin Mana er <br />store, Lot 1, Block 1 Elk River Crossing 3`d (west of Zane, south REVIEWED BY <br />of existing gas station/ convenience store), Case No. SP 12-02 - <br />Public Hearing <br />ACTION REQUESTED <br />Staff recommends approval of the Site Plan request, as illustrated on drawings dated received June 4, <br />2012, with the following conditions: <br />1. All. items of the staff comment letter dated May 18, 2012 shall be addressed. <br />2. As site plan approval is not a Building Permit,. the. applicant shall apply for all require <br />permits. <br />3. Thee landscape- plan needs to be signed by a landscape architect. and include: at least 16 over. <br />story, 8 evergreen, and 8 ornamental trees. <br />4. The lightingplanneedsto be adjusted to maintain an average of 3 footcandles. <br />5. The dumpster enclosure will. need to be modified to meet the PUD requirements. <br />6. Signage as shown is not approved, and willneed tomeet applicable regulations outlined in <br />the ER Crossing. PUD agreement. <br />7. A NPDES permit is required prior to grading operations. <br />Applicant AutoZone, Inc. <br />Location/ Address 18278 Zane Street <br />60 Day Rule The City must take action by July 1, 2012 <br />OVERVIEW <br />AutoZone is requesting site plan approval of their proposed 6,500 square-foot, one-story auto parts store <br />on Zane Street. <br />Site improvements include the building, landscaping, 45-stall parking lot, utilities and signage. The <br />project will employ 8-12 employees, with 3-5 per shift. <br />
The URL can be used to link to this page
Your browser does not support the video tag.