My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 10-11-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2011
>
10-11-2011
>
5.2. PCSR 10-11-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2011 3:20:57 PM
Creation date
10/7/2011 3:07:13 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
10/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />TO ITEM NUMBER <br />Plannin Commission 5.2. <br />AGENDA SECTION MEETING DATE PREPARED BY <br />Planning October 11, 2011 Jeremy Barnhart, Planning Manager <br />ITEM DESCRIPTION REVIEWED By <br />Request by Cornerstone Auto Resource fox Conditional Use erem Barnhart, Plannin Mana er <br />Permit, Public Hearing -Case No. CU 11-16 REVIEWED BY <br />ACTION REQUESTED <br />Staff recommends that the Planning Commission recommend approval of the Conditional Use Permit <br />request, as illustrated on drawings the following drawings, <br />Building elevations dated September 8, 2011 <br />Overall site plan dated September 26, 2011, sheet Al <br />Overall floor plan dated September 26, 2011, sheet A2 <br />Landscaping plan dated September 26, 2011, sheet L1 <br />with the following conditions: <br />1. As a Conditional Use Permit is not a Building Permit, the applicant shall apply for all require <br />permits. <br />2. The development shall meet all applicable fire codes. The Fire Chief shall verify the location of <br />all fire hydrants, and may require additional hydrants necessary to preserve the health and safety. <br />3. Landscaping plan illustrated on plans dated receieved <br />4. The sign package is not approved <br />5. The plat shall be recorded and fees paid prior to release of the building permit. <br />Applicant Cornerstone Auto Resource <br />Location/ Address 17219 Highway 10, NW <br />60 Day Rule The City must take action by November 26, 2011 <br />BACKGROUND/PRECEDENT <br />Auto sales are a conditional use in the C-3 Zoning District. Expansion of the building requires a <br />Conditional Use Permit. <br />The applicant received Conditional Use Permit approval in 2006. The development of the project was to <br />occur in 6 phases; to date, the first two phases are complete. The approval documents in 2006 included a <br />sunset date of 2010 for completion. Since that date has passed, a new Conditional Use Permit is required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.