Laserfiche WebLink
Supplemental Memo <br />Item # 9.6.1. <br />rover <br />MEMORANDUM <br />TO: Parks and Recreation Commission <br />FROM: Michele McPhersoir,-Director of Planning <br />DATE: July 12, 2004 <br />SUBJECT: Results of Misl<e Woodlands Tour <br />Attachments <br />• Narrative -Existing Natural Resources <br />• Excerpt from Project Narrative -River Paxk <br />• Updated Overall Site Plan <br />On Friday, July 9, 2004 Parks and Recreation Commission members Koester and Nziolek, <br />along with staff members Leeseberg and McPherson, walked the approximately 11-acre <br />wooded area in the southwest corner of the proposed Miske project. -The consensus of <br />those visiting the site was that it is a very good quality forest and that there axe very nice <br />overlooks from the forest to the meadow area within the overhead power line corridor. <br />Also on Friday, July 9`", staff received the revised and more-detailed site plan drawings of the <br />proposed River Pazk development. As noted in the project narrative, only 3 acres of the 11- <br />acre forest will remain, once grading is completed. In response, staff believes that the lots <br />noted on the attached site plan should be removed in order ro preserve the maximum <br />amount of forest cover available. This would result in the elimination of approximately 16 <br />single-family lots from the development. <br />Staff looks forward to the discussion of the tour and consideration of the park dedication <br />requirements for this project at the July Parks and Recreation Commission meeting. <br />S:APLdNNINGVCaac FilesV?004\P 0409 Rives PazkV7-L PnrR memo.doc <br />