Laserfiche WebLink
• <br />• <br />• <br />!JA <br />January 5, 2011 <br />Rich Czech <br />Arena Manager <br />1000 School Street N.W. <br />Elk River, MN 55330 <br />RE: Elk River Arena Renovation and Expansion <br />Dear Mr. Czech, <br />SJA Architects is pleased to submit this proposal letter and attachments related to architectural Preliminary- <br />Design Services for the Elk River Arena Renovation and Expansion. <br />SJA Architects, working with a diverse design team, has just completed the $62m 6700 seat Amsoil Arena at <br />the Duluth Entertainment and Convention Center, and is poised to assist the City of Elk River and the other <br />potential project stakeholders in studying options and costs of those options with respect to renovating and <br />expanding your current arena complex. SJA successfully led the diverse Design Team, along with Mortenson <br />directing the Construction Team, to complete the Amsoil Arena project on time and on budget, with LEED <br />Gold certification in process. I was the Project Manager on the Amsoil Arena project, and was intimately <br />involved in every phase of the project, from initial design studies through occupancy of the facility. <br />Based on my understanding of options being considered, the School District may also be involved in the <br />project in one capacity or another and potentially other parties also. We welcome the opportunity to discuss <br />and analyze all of the thoughts that are currently on the table, or those ideas that will come up as additional <br />potentially viable options. If need be in the planning process, we could certainly schedule a large group <br />Charrette, or address the issues in a smaller group setting, as you see fit. I have included a brochure on our <br />Charrette process, for your review. <br />At this point SJA is not committing to or proposing any specific engineering consultants, and likely would not <br />bring in the same team we used on the Amsoil Arena, due to scale of the project. However, we will fully <br />leverage the considerable experiences we gained during the Amsoil Arena design and construction process, <br />and as importantly, the shake-out process based on actual operations of the new facility. We have current <br />and applicable state-of-art experience to lend to the Elk River Arena project, and can assist the City in taking <br />advantage of the revenue generation options the expanded arena may offer. <br />We understand the City of Elk River is intending to use Commercial Refrigeration as the Ice Consultant on <br />your project. Mark Rodrigo, and their engineer-of-choice Stevens Engineers, both worked with SJA on the <br />Amsoil Arena. The knowledge and experience that the Commercial Refrigeration / Stevens Team brought to <br />the project was considerable; you are definitely making a very good choice by selecting those companies. <br />SJA Architects <br />11 E Superior Street <br />Suite 340 <br />Duluth, MN 55802 <br />P 218.724.8578 F 218.724.8717 sja-architects.com Duluth I St Cloud I St. Paul <br />