My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 12-20-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
12-20-2010
>
6.2. SR 12-20-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2010 9:14:12 AM
Creation date
12/17/2010 9:14:11 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/20/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~l <br />River <br />REQUEST FOR ACTION <br />To Item Number <br />Ci CouncIl 6,2, <br />Agenda Section Meeting Date Prepared by <br />Administration December 20, 2010 Tina Allard, Ci Clerk <br />Item Description Reviewed by <br />Proposed Fee Schedule fox 2011, Public Hearing Lori ohnson, Ci Administrator <br />^ Ordinance Amendment fox Adopting 2011 Fee Schedule Reviewed by <br />• Resolution fox Suunna Publication of the Ordinance <br />Action Requested <br />1. The Mayor to open and close the public hearing. <br />2. Council motion to adopt the 2011 Fee Schedule ordinance. <br />3. Council motion to adopt a resolution for summary publication of the ordinance. A four-fifth vote <br />is required. <br />Background/Discussion <br />Page 3 <br />Amendments/Renewals Requiring Public Hearings fox Conditional Use Permits (CUPS <br />CUP amendments usually require minimal staff resources, so these fees axe being reduced. <br />Page 4 <br />Engineering Services <br />This fee was previously billed by the consulting engineering firm and is based on the labor rate for the <br />engineering department to perform site plan reviews and inspections fox development projects. <br />General Planning Permit <br />This fee has always been in place but hasn't been listed on previous fee schedules. <br />Land Use Plan Amendment <br />This fee increased due to the staff resources associated with the review. The increase will cover extra time <br />and mapping needs. <br />Page 6 <br />Street/Right of Wav Disruption Permit <br />Letters of Credit can be difficult for contractors to obtain from banks due to the current economy so <br />staff would like to open this up for other options such as an escrow account. <br />N:\Departmen[s\AJzninistrative Services\Adminis'tration\Fee Schedule\7A11 memo on drzftdocx <br />
The URL can be used to link to this page
Your browser does not support the video tag.