Laserfiche WebLink
Ms Rebecca Haug <br />May 6, 2010 Page 3 of 3 <br />presented with the request do not show the construction of P2 and are not consistent with the <br />calculations. Revised surface water calculations for P2 must be modified to include the appropriate <br />portion of runoff from the area of uncontrolled drainage of the Cell 18 fuial cover slope (as indicated <br />above). <br />Please contact me if you have any questions or comments regarding my review of the ERL request for <br />amendment of the License/CUP. <br />Sincerely, <br />mar n lr 1 ental, LLC <br />~. <br />Matthew L. Ledvina, P.E. <br />Project Engineer <br />F:~PRQJECTS\CER-City of Elk River~2009-07.01\Corr\Letters 2010\1t100506Haug.doc <br />