My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 05-17-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
05-17-2010
>
5.4. SR 05-17-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 3:05:21 PM
Creation date
5/14/2010 2:29:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/17/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
622
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The proposed design is consistent with the existing design in that it incorporates a state, of <br />the art composite liner system; 2 feet of compacted clay soil barrier overlain by a 60 mil <br />high density polyethylene flexible membrane liner. Together, these two components of <br />the liner system prevent contaminants from penetrating the surrounding environment. <br />Overlying the liner section is the leachate collection layer. The leachate collection layer <br />consists of either 1 foot of highly permeable drainage sand or a synthetic drainage <br />material called a geocomposite. The geocomposite is comprised of high density <br />polyethylene channels manufactured to rapidly convey liquids and is considered equal to <br />the transmission capacity of 1 foot of drainage layer sand. <br />LEAUH AIERGa IErT lOF7'~PIPE~~ <br />\r ~COAR:E AGGRCATE <br />_~^ <br />12" 4P.ANlILAfl PRA WAGE LAYER-~, ~ ~ GEOIEXi)LE <br />\_ <br />12' iNTEReEO(dlE AGGRGA~E~.~ ~ ~ ~ ~` <br />.}~'~M ~ Ib _JI ~ ._.sp ml l RDPE GEIyAEh6RANE <br />nl l 3 ~ <br />~_".. <br />j -~ ~~- _- _ ~ ~ ~ , ~ C~~~. .~~ '~.:,,L ''~-2C` CL A'f eARRfEF. LATER <br />+~~ 7Ii ~ ~~hi~ {~t~ `;~1 14 ~.~~' ~~ , 1T. ;k~ ~ iA ^•"~-SUHGRAOf. <br />Liner System <br />The final cover section is similarly designed with a layer of buffer material installed over <br />the final waste elevation prior to the placement of a 40 mil linear low density <br />polyethylene liner material that is overlain by either a sand drainage material or a <br />synthetic drainage material, geocomposite. The final layer of the landf 11 cover section is <br />a layer of soil material that can sustain and promote vegetative growth. <br />T:10742\iAOC\CilrAppt:eb\PEB Repon_6nRl (2).doc '1 _ O <br />
The URL can be used to link to this page
Your browser does not support the video tag.