My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 05-11-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2010
>
05-11-2010
>
5.2. PCSR 05-11-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2010 12:39:26 PM
Creation date
5/10/2010 9:25:28 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
5/11/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.4 PROPOSED FACILITIES AND OPERATIONS <br />2.4.1 Infrastructure <br />Expansion of the following existing infrastructure systems will be required as part of the <br />proposed project: <br />• Gas extraction wells, piping, and monitoring probes installed in accordance with <br />the New Source Performance Standards (NSPS) and Title V air permit. <br />• Gas to energy plant and. back-up flare in accordance with the Title V air permit <br />and NSPS regulation <br />• Leachate collection and management as approved by the MPCA <br />• Groundwater monitoring wells as approved. by the MPCA. <br />2.4.2 OperationalImpacts <br />2.4.2.1 Hours of Operation <br />The ERL will continue to limit its operations to the hours of 6:00 am to 7:00 pm, Monday <br />through Satut•day, excluding holidays. Dw•ing that time, the landfill will be operated in <br />accordance with the operational requirements enforced by the MPCA, Sherburne County <br />and the City. The landf 11 may accept waste during the of[' hours only under certain <br />circumstances. <br />2.4.2.2 Traffic, Parking, and Signage <br />The EIZL employs approximately 14 people at the current landfill site. There are 20 <br />parking stalls located at the office building site as well as ample room for parking in the <br />yard area to the north of the building. The landfill employee numbers are not expected to <br />increase with the proposed expansion. Additionally, there is no increase in traffic to the <br />facility expected with the proposed expansion. <br />T:\o742U 4UC,\CiryApppeb\PEB Repon_final (2).doc 2-~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.