My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-07-2010 SITE PLAN REVIEW PACKET
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Site Plan Review
>
2010
>
04-07-2010
>
04-07-2010 SITE PLAN REVIEW PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2010 3:20:57 PM
Creation date
4/5/2010 4:04:56 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/7/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III: STANDARDS <br />1.) Boundary: <br />Extraction operations shall be conducted within the currently permitted <br />areas and within the proposed areas shown on Figure 2. <br />2.) Setbacks: <br />Site setbacks will comply with the City of Elk River's Mineral Extraction <br />Standards. <br />3.) Fencing:. <br />The entire site is fenced. <br />4.) .Appearance and Screening: <br />All equipment will be kept operational. Within 3 months after termination <br />of mining, or within 3 months after termination of the extraction license, all <br />buildings and structures incidental to extraction operations will be <br />removed. The site will be graded in accordance with the reclamation plan. <br />5.) Operating Standards: <br />a. Noise: <br />The mining operation will be operated in compliance with State <br />noise standards. <br />b. Hours: <br />Mining and crushing will be conducted between 7:00 a.m. to 7:00 <br />p.m. Monday through Saturday. <br />c. Explosives: <br />There-will. be no explosives used at this site. <br />d. Fugitive Dust: <br />.Fugitive dust will be ;minimized by watering internal :haul roads <br />and/or the use of conveyors. <br />
The URL can be used to link to this page
Your browser does not support the video tag.