My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-07-2010 SITE PLAN REVIEW PACKET
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Site Plan Review
>
2010
>
04-07-2010
>
04-07-2010 SITE PLAN REVIEW PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2010 3:20:57 PM
Creation date
4/5/2010 4:04:56 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/7/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.8 LANDFILL CLOSURE <br />The ERL has site-specific provisions in place for the closure of the landfill in accordance <br />with their site permits. The ERL guarantees these closure activities, as well as post- <br />closure care and. potential contingency actions that may be required, through the use of a <br />surety bond in accordance with the financial assurance requirements by the MPCA. <br />Closure-plans for the existing portions of the facility have previously been approved by <br />the MPCA, Sherburne County and the City, and upon submittal of the necessary MPCA <br />permit application for the proposed increase in footprint, updated closure, post-closure <br />and contingency action plans and cost estimates will be submitted. Final contours, <br />surface water drainage calculations, and an end use plan are included in this submittal. <br />As the ERL enters closure of the landfill, existing fencing will be utilized and <br />supplemented as necessary for the purposes of security. After final closure of the site, <br />while the entire site will be secure, certain portions of the site will be secured such that <br />only those persons authorized by the ERL will be permitted in these areas to perform <br />closure and post closure activities. <br />2.9 CLOSURE CONSTRUCTION. <br />The proposed expansion will be closed as part of a phased closure construction. The <br />anticipated closure sequence and timing for the proposed expansion will occur i~1 <br />approximately 2018, as part of the final phase of closure construction. The timing of <br />construction will be dictated in part by incoming waste volumes. Closure of the landfi l l <br />includes the engineered cover system, gas collection components, and the surface water <br />controls included MPCA permit application documents and approved by the MPCA. <br />The City, as well as the MPCA and Sherburne County, will be notified of impending <br />phased closure at the ERL prior to initiation of closure construction. The details of the <br />T:\0742\] 40[\CimApppeb\FEB Repon_6na1 (2). doc 1- 7 O <br />
The URL can be used to link to this page
Your browser does not support the video tag.