Laserfiche WebLink
z <br /> w~ <br />z <br />c m= <br />N ~ ~. <br />CDVER SDILS <br />GEDI~JET <br />TEYTUREd 40 mil <br />\ '~~1t~C~ ~ s?~. \\ I;vr`Fr ~ i LLdPE GEDhhEI~dERA.NE <br />--BUFFER uCiILS <br />Cover System <br />The landfill base liner, in conjunction with the final cover liner, completely encapsulates <br />the MSW materials from the surrounding environment. <br />The site currently generates electricity from the methane gas extracted during the waste <br />degeneration process. The methane extraction system will continue to be developed as <br />the landfill is final covered. The landfill gas extraction wells are constructed in <br />accordance with industry standards and the ERL's air permits. <br />The proposed expansion will be constructed as an additional phase (Cell 18) consistent <br />with the current series of phased cell construction and closure projects. The timing of the <br />projects will be dictated by incoming waste volumes and site operations. It is anticipated <br />that the Cell 18 of the landfill will be partially constructed in 201 1. <br />~'-~TDPSOIL <br />T:10742\I40C1Ciry~AppFeb\FEB Repon_f nxI (2).doc 2-" <br />