My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.6. SR 03-15-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
03-15-2010
>
6.6. SR 03-15-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2010 4:00:48 PM
Creation date
3/12/2010 4:03:20 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fw Elk .River Land~i 11 ~- nevi eve o~ phase ~x~ Report far MsW . ~xpansi on ; txt , <br />The expected , l i ~'~ a•F, the ~aci ~ ~ ~ i s more than ~.9 years . The total rema7 n~ ng 1 ~ fe <br />o~ the ex~st~n~ permitted land~~ ~ area and the expansion area is more than ~8 <br />years . The ex~ sti ng and proposed monitoring we71 s are 1 acated , at the distance <br />roughly 2gD , ~ee~ •~rom the u1 t~ mate fi 11 boundary es ; The ~unct~ anal i t o~ an earl y <br />warns ng mono tarp ng system du r~ ng the o erati anal 1 ~ ~e o~ the s~ to w~ t wells 1 ocated <br />~ n the + proposed asp tz ans ~ s ~ quests ona 1 e. The averal 1 schedule for the p1 acement <br />o~ mangy tors ng we 1 s ~ n ref ate on to the s~ to level apment needs to be •Further <br />evaluated. <br />A sequenced approach to monitoring system development is necessary when 1and~ill <br />development progresses Tn a dawngrad~ent ~ash~an and the pra~ected l~~e/capacity o~ <br />the proposed development is extended. zt is suggested that the wells propas~d for <br />the southern property boundary be moved northward to a posi ti on which coincides wi ~h <br />the ten--year waste ~~ 11 1 ~ mi t . These we I 1 s would subsequently be replaced w~ th . <br />we11s located at the south property boundary when the ~~11 progresses to this point. <br />zt should be noted that ~ •~ the waste recei v~ ng rates decrease, the we11 s waul d be <br />•i n position to moni tar the ~aci 1 ~ ty an an expanded time game <br />conclusion : overal 1, ,the report does a very good ~ ab o-~ characteri ~~ ng the complex <br />geology o~ the expansion site. z think one,o~ the next steps wil~ be tv sit down <br />w~ th WM~ to d~ scuss the approach to the mono tors ng network. wMS ~ s prapos~ ng we11 <br />installation this summer, so this Should happen soon. <br />For WMZ's bene•~it, it would be appropriate for the city, count and the MPCA to be <br />on the same praverb~al page. I~et me knave what you think o~ t ese comments. <br />Thanks, Matt, <br />ur wwr•ws~w•w~ws .'u '+M wHww~rw W •nw•w ~gwrver wMMwMwwwaawm o ase.w a•w.r rq ~w awww•w w~pp'a ver nnAw Arw~n ~rw wove <br />Matthew ~edvina, p~ <br />m11 edvi na~ergl td. cam <br />51~. X39, Z~~.6 ai rest <br />~~.~.3~5,~~~9 cell <br />6~.~.~~9.~994 Fax <br />page ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.