My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.6. SR 03-15-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
03-15-2010
>
6.6. SR 03-15-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2010 4:00:48 PM
Creation date
3/12/2010 4:03:20 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fw ~1 k River ~andfi 11 -Review of Phase z~~ Report for Msw ~xpansi on . tx~~ <br />w~ 11 not be a~Ffected by the development of the s~ te, The eng~ neeri ng design 'For <br />surface water routi n wi 11 result i n a si gn7 f ~ cant change i n the hydraul ~ cs for the <br />wetland area. The a sects on the wetland are unknown a~ this time, The <br />s~ gni fi cance of 1 oval ~ zed groundwater recharge from i nf~ 1 trat7 on at the <br />sedi mentati an ponds i s unknown at this time . zt may be appropriate to assess <br />impacts to the wetland area and groundwater using a technical approach, <br />pa e ~.4, water well survey: A comprehensive updated water we11 survey is presented. <br />~" a Ri dges of Rice Fake communi t water sup 1 y we11 i s 1 ocated ,approximately Z/3 <br />m~ 1 e , dvwng radi ent of the s~ to . T e atent~ a for 7 mpacts to the s well 7 s very sma11 <br />cons derv n the we11 cased to a de th f n <br />g ' o early X40, feet, however CRS. shoal d <br />cons der the ~ ncl use on of the s wet ~ n the res~ dents a1 wee 1 mangy tor? ng program. <br />pale ~.5, Conti nuous Ti 11 Layer; A d~ scussi on i s rovi led regardi n~ the fine-grad ned <br />so~1 deposits ~ti11~ separat~n~ the upper outwas unit from the lower outwash <br />un~ t. zt i s stated that the the ckness of the ti 11 depas~ is vary es from ~ to more <br />than 5o feet at the site. Pi~ure ~~ presents a Till zsopach Map which shows areas <br />of the site where the ti 11 the ckness i s 1 ess than ten feet, Althouggh ~ t i s not <br />stated within the text of the re ort ar on the ma i t i s i m 1 i ed th ~~ the ti 1 <br />, ~~ ~p a 1 <br />1 a er ~ s cants nuous throughout t e s~ te, ~'he ava~ 1 abl e bore ng data suggest that the <br />ti 11 <br />1 ayer i s cant? nuous, however, the bore ngs ~ n the west central port? on of the <br />site do not extend to an adequate depth to definitively make this conclusion. ~t <br />should be noted that borings 9, l~ ~?~, Z~, Z5 to do not provide evidence that the <br />ti 11 i s centi nuous. rt should be fur~~her noted that the geo1 a~~ c cross-sects ons <br />why ch dep~ ct a cont~ nuous ti 11 1 ayer far this porti an of the s~ to are interpretive. <br />There exists a possibility that the ti~1 is discontinuous at the site and the u per <br />and lower outwash units are in h' draul~c connection, rt should be noted that the <br />absence of the ti 11 1 a er i s they i tuati an which i s re en f ' <br />y , ~ s p ~ ~ or the ex~st~ng <br />~ and~i 11 ~ area i n the v~ ~~ n~ ty of the ~RL shop. n1 scanty nub ty of the t~ 11 1 ayer has <br />~ mpl 7 cats ons far establ ~ shy ng an effective groundwater mvn~ tore ng system at the <br />site. <br />Page Z0, groundwater t~ischar e; The report states ghat graundwater,in the north. <br />central pperti on of the s~ to 1 ows northwest and ~ s ~ nterpreted to d~ schar~e to R~ ce <br />~.ake T1 bb~ is ~roo . ~t ~ <br />k s understaad that WM~ .has conducted additional s~ to <br />investigation related to the groundwater im acts from the existing waste deposit, <br />No data has yet been presented to support t is groundwater discharge conclusion. <br />Wage ZZ, ~rvundwater Monitoring; WMT proposes the addition of one nested piezameter <br />in the lower outwash to evaluate the hydraulic gradient across the ti11 layer. <br />Gives the concerns re~ardin the cantinuity,of ti11 layer, the,piezometer should be <br />ut~ 1 ~ zed as a moni tort ng we 1 and i nc1 uded , ~ n the proposed man? Lori ng work p1 an, A <br />second nested moni tore ng we11 CP~zZC 1 ocat~ on sug~ested~ should be installed a1 ang <br />the western parti an of the south boundary for si m~ 1 ar gradient and water quality <br />moni sari ng purposes . <br />A maximum spacing of 4Qg feed between down radient compliance boundary moni~aring <br />we11 s has be used for the ex~ sti n 1 andfi 1 ~, - s su e <br />g ~~t ~ gg~sted that this maximum <br />space ng be may nta7 ned for the 1 andf~ 11 expanse on. Thy s ~ mp1 ~ es that several <br />addi ti anal upper outwash moni tar? ng we11 s would be i nc1 uded i n the ~~ani sari ng <br />network, <br />page ZZ, we11 installation,schedule; ,The report stakes that the current network of <br />moni tors ng we11 s ~ s suffi c7 ent to moni for the expanse on of the f~ 11 area through <br />Ce11 ZO' The southerly 1 i mi t of fi 11 of Ce11 ZO wou1 d correspond to plan stag an <br />Z45, ~D~ based on avai 1 ab1 a en i neeri ng pl ons for site level apment. Frain the <br />conce tual W dra solo is Model F' r 1 s <br />p y ~ g g ~gu,e 7, a .authwesterly component to groundwater <br />flow from porn ons of the pro ased f~ 11 area ~ s apparent.. There are no mon7 tori ng <br />we11 s existing a r p1 anned wit i n a reasonabl y cl ase distance that would intercept <br />these groundwater f1 ow 1 i Wes . The sui tabi 1 i ty of the existing network of we11 s to <br />moni tar the level opment of the site through ce11 ZO i s questi anabl e, <br />page Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.