My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.6. SR 03-15-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
03-15-2010
>
6.6. SR 03-15-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2010 4:00:48 PM
Creation date
3/12/2010 4:03:20 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~'a~e G oi' ~ <br />Ect~~t~ ~a fir. Joh~~ Elits ~ Mr. ~at# Eedvix~a <br />RE; ~eviscd ~I~A l~ydra~eoio~ic Evaiua~iora Report <br />EIk River Eandfiii, inc. <br />A sequenced approach to monitoring system development is necessary when landf ill <br />development progresses in a downgradient fashion and the prof ected life/capacity of <br />the proposed development is extended, It r`s suggested that the wells proposed for the <br />southern property boundary be moved northward to a position whic~i coincides with <br />the ten~yea~ waste~ll limit. These wells would subsequently be replaced with weds <br />located at the south property boundary when tlie~ll progresses to this point, rt slio~cld <br />be noted that if the waste ~~eceiuing rated d~c~^eas~, the wells would b~ in posztian to <br />monitor the facility on an expanded tune frame, <br />The proposed SSA cells are graded to direct leachate toward the collection sumps on <br />the eastern portion of the site. The leachate sumps are considered the most likely <br />locat~ans of an environment~.l release due to the accumulation of up to 12ainches of <br />leachate head. above the liner, ~3ased an observed gxaun.dwater elevations, a release of <br />leachate from the sump of cell ~o is anticipated to migrate to proposed monitoring <br />paints ~ i S-Q~'A or 3~~p~WA, Please refer to Figure 2~, <br />As indicated. by the MPCA., the configuration of the groundwater monitoring system <br />shall not be determined until completion of the hydrogeolagic investigation. <br />Z sincerely appreciate your input on this project and the appart~.nity to discuss the scope of the <br />investigatiou. with you at various stages. Please contact me at your convenience if you have <br />any questions. <br />Si~acerely, <br />Terry Johnson <br />I~ire~tor, groundwater Protection Program <br />Waste Management, Znc, <br />Encl <br />Cc: deb ~ehn, Elk River Landfill <br />Stephanie Stab, Elk River Lands 11 <br />Ueb Mc~onald, Waste Management, inc. <br />Steve Rohlf, .City of Elk Rl.ver <br />have Lucas, Shez~burne County <br />Jeffery Ubi, Farr Engineering Company <br />Jim Eidem, geomatrix Consultants, znc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.