Laserfiche WebLink
~~. The City shall be notified by tlae Permittee immediately upon the occurrence <br />of any explosion, hre, or other emergency at the Facility; upon the discovery, <br />release or spill of hazardous or dangerous materials, as defined in floe City of <br />Elk River Solid Waste ordinance, at the Facility; and of any violations of the <br />conditions of the Permit, Air Emission Facility Permit No. ~ ~ ~ ~ ...l 4:l_ ~~:~022- <br />00~ ar Per~~t for a Waite Proccir~g F~.clitl end Syste~,1~To. SW-~0~. <br />w~ <br />~~ ~~~1 ~~~°rv~~~~.=~:a~~~~~ ~~~ 'i~~~~°~~` i J.he specific requirements for how, when and <br />who to notify at the City shall be set forth in a separate letter f~•om City Staff <br />to Per~nittee. This letter may be revised or supplemented by City staff f~•om <br />time to time as necessary to address the City's needs for notification. <br />• <br />~-8-;7. All MSw, RDF, Reject orResidue-hauling truck traffic entering or exiting the <br />Processing Facility or the But•~1 Facility shall use only those highways and <br />streets as allowed in writing by the City Council, avoiding the use of Main <br />Street and residential streets, if at all possible. Truck traffic originating in the <br />City may use other public streets. <br />~;8. The Facility may operate twenty-four X24} hours a day, However, the City <br />reserves the right to restrict the haurs of operation of the Facility to no~•~~al <br />business haurs if noise emanating from the Facility to surrounding residential <br />properties is unacceptable. Receiving and transporting MSw and rej eets at <br />the Processing Facility lnay take place twenty-four (24} hours a day, Monday <br />through Saturday. However, the City reserves the right to restrict further the <br />hours of receiving and transporting MSw at the processing facility if <br />necessary to protect the public health, safety, and welfare. RDF maybe <br />transpol•ted twenty-four X24} hours a day. At the Processing Facility, all truck <br />and Processing Facility wash water shall be diverted and captured in a <br />retention tank so that it does not enter the groundwater system. <br />L?9. The processing Facility shall be enclosed by a minimum six-foot and no more <br />that eight-foot high chain linl~ fence. <br />-~4~:10, Testing as requested by State agencies of storm water run-off captured in the <br />on-site retentionldetention pond. Per~~aittee shall provide City evidence of <br />S~\PLANNING MAIN\Case Files\CUPICU Q-~~ Resource Recovery Technologies\CUP <br />