Laserfiche WebLink
5. The third party wind generator, which is used by Energy City as a demonstration site, <br />produced 875,000 kWh in 2009. The annual capacity factor is 15.1%. This is low in <br />compazison to other wind generators; however, this is due to the lack of sufficient wind <br />resource available in this part of the State. <br />6. Added 28 commercial accounts for a total of 1,104. Added 127 residential accounts and <br />121oad management meters for a total of 8,467. <br />7. Continued system maintenance and fuse coordination through a systematic program to <br />change failing cutout and resize system fusing. <br />8. Constructed a new distribution feeder along County Road 1 in preparation for an <br />upcoming 2010 territory acquisition. Constructed a new feeder under Highway 101 in <br />Otsego. <br />9. Maintenance work and cable replacement performed in projects on Simonet Drive, Xenia <br />Avenue, 191 '/2 Avenue, and Area 23. <br />10. Installed street lighting along 193`d Avenue extension. <br />