Laserfiche WebLink
Case File: C~ 10-01 <br />Page 2 <br />Elk River Baat Storage <br />Lapland Properties ~Dennysharp} <br />~ner~~ n'®rr~,t~~n ~ . <br />~cnt Lakeland Properties, LLC <br />a. use The application has been deemed complete as of December 7, <br />Z~D9:. The City must take action by April 7, 200 <br />eu~s~ c~~~n Conditional Use Permit Approval <br />~ca~~~n end ~~~ Approxi~natelyb.I9 acres north of ~atewayRoad, west of Jarvis. <br />~c.~i~n ~~~n s~ Lan se ~a~n es~na~~®n urr~nt ®n~n <br />u'~c <br />~ <br />r®~r Undeveloped Li ht Industrial <br />g I-~ Li ht Industrial <br />g <br />~r Ministorage Medium Industrial I-2 Medium <br />Industrial <br />®u Undeveloped Light Industrial I- I Light Industrial <br />ash Undeveloped Light Industrial I- I Light Industrial <br />~s Undeveloped Light Industrial I- ~ Light Industrial <br />~~~~~~ <br />Denny Sharp, on behalf of Lakeland Properties, is requesting Conditional Use permit to build and <br />operate a ministorage business on GaxewayRoad. The ministorage would house boats and RV's. <br />The project would consist initially of two ministorage buildings formira.g the southen~. and eastern <br />boundaries of the site. As business builds, the applicant proposes outside storage boats, RV, <br />campers, etc} north and west of the proposed buildings. Future phases would include the <br />construction of two more ministorage buildings, eventually e ~ ~ acing the need f or outside storage, <br />The main building will include space housing a computer and other security hardware. The <br />applicant is considering including an office, which would require a restroom. The septic system is <br />proposed for the SE corner of the site, if an office is added. The buildings will be prefinished metal <br />panels. Buildings will be tan, with a green trim. These materials are consistent with the basic design <br />guidelines imposed on buildings in the I-1 zoning district. <br />The Conditional Use Permit, if approved as proposed, would allow interim outside storage (until the <br />4`h building is built), and the construction of 4 ministorage buildings. <br />Other site improvements include a wrought iron style fence along Gateway Road, chain link along <br />the east side, and a black coated chain-link along the north side. The north side abuts the <br />Burlington Northern Santa Fe railway. In conversation, the applicant has indicated a desire to <br />S;IPLANNING MA1N1Case FileslCUP1CU 10-01 SharplCU 10-01 SRto PC2.9.10.dac <br />